As of 23 October 2026, 50 kW Charger at Bruce House, Wellgate, Arbroath has 3 connectors up to 51 kW, run by Charge Place Scotland. Its trevl reliability score is 96/100. Over the last 30 days its connectors were working 97.2% of the time, with at least one connector out of service on 30 days. It is usually busiest on Wednesdays at 16:00 and quietest on Mondays at 07:00 (UK time). Right now: 1 of 3 free, checked just now.
Very reliable: scored 96 out of 100, which reads as roughly the chance it is working when you arrive.
Checked just now.
As published by the operator.
Connectors
| Connector | Power | Status |
|---|---|---|
| CCS | 51 kW | In use |
| CHAdeMO | 51 kW | Out of service |
| Type 2 | 22 kW | Available |
When it’s busy
How busy the site usually is, by day and hour (UK time). Darker means more of the working connectors are in use.
| 00 | 03 | 06 | 09 | 12 | 15 | 18 | 21 | |||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Mon | ||||||||||||||||||||||||
| Tue | ||||||||||||||||||||||||
| Wed | ||||||||||||||||||||||||
| Thu | ||||||||||||||||||||||||
| Fri | ||||||||||||||||||||||||
| Sat | ||||||||||||||||||||||||
| Sun |
Striped cells are hours without enough history to say.
Monday 07:00 (0% in use), Monday 08:00 (0% in use), Monday 09:00 (0% in use)
Wednesday 16:00 (39% in use), Wednesday 15:00 (27% in use), Thursday 20:00 (26% in use)
Track record
Share of the time its connectors were available or charging a car, across 31 days of readings.
Days when at least one connector was reported out of service, however briefly.
No trevl driver has reported on this site recently.
Questions about 50 kW Charger at Bruce House, Wellgate, Arbroath
Is 50 kW Charger at Bruce House, Wellgate, Arbroath reliable?
Very reliable: scored 96 out of 100, which reads as roughly the chance it is working when you arrive. Over the last 30 days its connectors were working 97.2% of the time we checked. At least one connector was reported out of service on 30 of the last 30 days.
When is 50 kW Charger at Bruce House, Wellgate, Arbroath busiest?
It is usually busiest on Wednesday 16:00 (39% in use), Wednesday 15:00 (27% in use), Thursday 20:00 (26% in use). The quietest daytime slots are Monday 07:00 (0% in use), Monday 08:00 (0% in use), Monday 09:00 (0% in use). Times are UK time and come from weeks of live status readings.
How much does it cost to charge at 50 kW Charger at Bruce House, Wellgate, Arbroath?
The operator publishes a price of 60p per kWh. Prices change, so check the operator's app or the charger itself before you plug in.
What connectors does 50 kW Charger at Bruce House, Wellgate, Arbroath have?
50 kW Charger at Bruce House, Wellgate, Arbroath has 1 × CCS at 51 kW, 1 × CHAdeMO at 51 kW, 1 × Type 2 at 22 kW.
Is 50 kW Charger at Bruce House, Wellgate, Arbroath working right now?
1 of 3 free. Checked just now. The operator publishes live status, and trevl reads it every few minutes.
Other chargers nearby
All rapid chargers in Arbroath, ranked by reliability
- 22 kW Charger at Bruce House, Wellgate, Arbroath0 km away · 22 kW · Charge Place Scotland
- Pod Point Tesco Superstore - Arbroath0.2 km away · 50 kW · Pod Point
- Dundee & Angus College, Arbroath Campus, Arbroath0.4 km away · 22 kW · Charge Place Scotland
- Stanley Street Car Park, Arbroath0.6 km away · 50 kW · Charge Place Scotland
- Ladybridge Street, Arbroath0.7 km away · 51 kW · Charge Place Scotland
- 22kW Charger at Friockheim Park, Friockheim9.3 km away · 22 kW · Charge Place Scotland
- 50kW Charger at Friockheim Park, Friockheim9.3 km away · 50 kW · Charge Place Scotland
- Friockheim Hub, Eastgate9.8 km away · 7 kW · Charge Place Scotland
Plan a route that only stops where the chargers work
trevl watches sites like this one around the clock and plans your charging stops around the ones that will be working when you arrive, whatever you drive.