Ashlands Lakes Car Park, Milton Keynes
Newington Gate , Simpson, Milton Keynes, MK6 3AA
As of 24 October 2026, Ashlands Lakes Car Park, Milton Keynes has 1 connector up to 22.1 kW, run by char.gy. Its trevl reliability score is 92/100. Over the last 30 days its connectors were working 100% of the time, with no faults reported. Right now: 1 of 1 free, checked 1 hour ago.
Very reliable: scored 92 out of 100, which reads as roughly the chance it is working when you arrive.
Checked 1 hour ago.
As published by the operator.
Connectors
| Connector | Power | Status |
|---|---|---|
| Type 2 | 22.1 kW | Available |
When it’s busy
We’re still learning this site’s pattern. Busy times appear here once we’ve seen each hour on at least three separate days.
Track record
Share of the time its connectors were available or charging a car, across 31 days of readings.
Days when at least one connector was reported out of service, however briefly.
No trevl driver has reported on this site recently.
Questions about Ashlands Lakes Car Park
Is Ashlands Lakes Car Park reliable?
Very reliable: scored 92 out of 100, which reads as roughly the chance it is working when you arrive. Over the last 30 days its connectors were working 100% of the time we checked. No connector was reported out of service in the last 30 days.
How much does it cost to charge at Ashlands Lakes Car Park?
The operator publishes a price of 49.2p per kWh. Prices change, so check the operator's app or the charger itself before you plug in.
What connectors does Ashlands Lakes Car Park have?
Ashlands Lakes Car Park, Milton Keynes has 1 × Type 2 at 22.1 kW.
Is Ashlands Lakes Car Park working right now?
1 of 1 free. Checked 1 hour ago. The operator publishes live status, and trevl reads it every few minutes.
Other chargers nearby
All rapid chargers in Milton Keynes, ranked by reliability
- Ashland Lakes0 km away · 50 kW · bp pulse
- The Plough, Milton Keynes0.3 km away · 75 kW · Osprey Charging
- Buckland Drive Roundabout1 km away · 7.4 kW · bp pulse
- Pod Point MK1 Leisure Park1 km away · 7 kW · Pod Point
- Lakeside Grove1.1 km away · 50 kW · bp pulse
- Pod Point MK1 Shopping Park1.1 km away · 7 kW · Pod Point
- EH - IKEA Milton Keynes1.2 km away · 50 kW · GRIDSERVE-GRD
- Pod Point Glyn Hopkin Nissan Milton Keynes1.4 km away · 7 kW · Pod Point
Plan a route that only stops where the chargers work
trevl watches sites like this one around the clock and plans your charging stops around the ones that will be working when you arrive, whatever you drive.