As of 23 October 2026, Drumgelloch Railway Station, Airdrie, Station Road has 12 connectors up to 50 kW, run by Charge Place Scotland. Its trevl reliability score is 99/100. Over the last 30 days its connectors were working 99.3% of the time, with at least one connector out of service on 27 days. It is usually busiest on Sundays at 15:00 and quietest on Mondays at 10:00 (UK time). Right now: 10 of 12 free, checked 2 minutes ago.
Very reliable: scored 99 out of 100, which reads as roughly the chance it is working when you arrive.
Checked 2 minutes ago.
As published by the operator.
Connectors
| Connector | Power | Status |
|---|---|---|
| CCS | 50 kW | Available |
| CCS | 50 kW | Available |
| CHAdeMO | 50 kW | Available |
| CHAdeMO | 50 kW | Available |
| Type 2 | 22 kW | Available |
| Type 2 | 22 kW | In use |
| Type 2 | 22 kW | Available |
| Type 2 | 22 kW | Available |
| Type 2 | 22 kW | Available |
| Type 2 | 22 kW | Available |
| Type 2 | 7 kW | In use |
| Type 2 | 7 kW | Available |
When it’s busy
How busy the site usually is, by day and hour (UK time). Darker means more of the working connectors are in use.
| 00 | 03 | 06 | 09 | 12 | 15 | 18 | 21 | |||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Mon | ||||||||||||||||||||||||
| Tue | ||||||||||||||||||||||||
| Wed | ||||||||||||||||||||||||
| Thu | ||||||||||||||||||||||||
| Fri | ||||||||||||||||||||||||
| Sat | ||||||||||||||||||||||||
| Sun |
Striped cells are hours without enough history to say.
Monday 10:00 (0% in use), Tuesday 07:00 (0% in use), Tuesday 08:00 (0% in use)
Sunday 15:00 (27% in use), Sunday 14:00 (20% in use), Sunday 17:00 (18% in use)
Track record
Share of the time its connectors were available or charging a car, across 31 days of readings.
Days when at least one connector was reported out of service, however briefly.
No trevl driver has reported on this site recently.
Questions about Drumgelloch Railway Station, Airdrie
Is Drumgelloch Railway Station, Airdrie reliable?
Very reliable: scored 99 out of 100, which reads as roughly the chance it is working when you arrive. Over the last 30 days its connectors were working 99.3% of the time we checked. At least one connector was reported out of service on 27 of the last 30 days.
When is Drumgelloch Railway Station, Airdrie busiest?
It is usually busiest on Sunday 15:00 (27% in use), Sunday 14:00 (20% in use), Sunday 17:00 (18% in use). The quietest daytime slots are Monday 10:00 (0% in use), Tuesday 07:00 (0% in use), Tuesday 08:00 (0% in use). Times are UK time and come from weeks of live status readings.
How much does it cost to charge at Drumgelloch Railway Station, Airdrie?
The operator publishes a price of 70p per kWh. Prices change, so check the operator's app or the charger itself before you plug in.
What connectors does Drumgelloch Railway Station, Airdrie have?
Drumgelloch Railway Station, Airdrie, Station Road has 2 × CCS at 50 kW, 2 × CHAdeMO at 50 kW, 6 × Type 2 at 22 kW, 2 × Type 2 at 7 kW.
Is Drumgelloch Railway Station, Airdrie working right now?
10 of 12 free. Checked 2 minutes ago. The operator publishes live status, and trevl reads it every few minutes.
Other chargers nearby
All rapid chargers in Airdrie, ranked by reliability
- Colston SF Connect0.9 km away · 150 kW · bp pulse
- Annieshill View1.6 km away · 7 kW · Charge Place Scotland
- Morrisons Airdrie1.7 km away · 50 kW · MFG EV Power
- Hallcraig Street1.7 km away · 51 kW · Charge Place Scotland
- Cairnhill Road2 km away · 50 kW · Charge Place Scotland
- Airdrie Railway Station, Broomknoll Street, Airdrie2 km away · 22 kW · Charge Place Scotland
- Dykehead Road2 km away · 7 kW · Charge Place Scotland
- Riverbank Community Hub3.6 km away · 7 kW · Charge Place Scotland
Plan a route that only stops where the chargers work
trevl watches sites like this one around the clock and plans your charging stops around the ones that will be working when you arrive, whatever you drive.