EH - MOTO Chieveley
Oxford Road, Chieveley, RG18 9XX
As of 23 October 2026, EH - MOTO Chieveley has 35 connectors up to 400 kW, run by GRIDSERVE-GRD. Its trevl reliability score is 100/100. Over the last 30 days its connectors were working 99.9% of the time, with at least one connector out of service on 13 days. It is usually busiest on Sundays at 16:00 and quietest on Thursdays at 21:00 (UK time). Right now: 29 of 35 free, checked just now.
Very reliable: scored 100 out of 100, which reads as roughly the chance it is working when you arrive.
Checked just now.
As published by the operator.
Connectors
| Connector | Power | Status |
|---|---|---|
| CCS | 400 kW | Available |
| CCS | 400 kW | In use |
| CCS | 400 kW | Available |
| CCS | 400 kW | Available |
| CCS | 400 kW | Available |
| CCS | 400 kW | Available |
| CCS | 400 kW | Available |
| CCS | 400 kW | Available |
| CCS | 400 kW | Available |
| CCS | 400 kW | Available |
| CCS | 400 kW | Available |
| CCS | 400 kW | Available |
| CCS | 350 kW | Available |
| CCS | 350 kW | In use |
| CCS | 350 kW | Available |
| CCS | 350 kW | Available |
| CCS | 350 kW | Available |
| CCS | 350 kW | Available |
| CCS | 350 kW | Available |
| CCS | 350 kW | In use |
| CCS | 350 kW | In use |
| CCS | 350 kW | Available |
| CCS | 350 kW | Available |
| CCS | 350 kW | In use |
| CHAdeMO | 100 kW | In use |
| CHAdeMO | 100 kW | Available |
| CHAdeMO | 100 kW | Available |
| CHAdeMO | 100 kW | Available |
| CHAdeMO | 100 kW | Available |
| CHAdeMO | 100 kW | Available |
| CCS | 50 kW | Available |
| CCS | 50 kW | Available |
| CCS | 50 kW | Available |
| CHAdeMO | 50 kW | Available |
| Type 2 | 11 kW | Available |
When it’s busy
How busy the site usually is, by day and hour (UK time). Darker means more of the working connectors are in use.
| 00 | 03 | 06 | 09 | 12 | 15 | 18 | 21 | |||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Mon | ||||||||||||||||||||||||
| Tue | ||||||||||||||||||||||||
| Wed | ||||||||||||||||||||||||
| Thu | ||||||||||||||||||||||||
| Fri | ||||||||||||||||||||||||
| Sat | ||||||||||||||||||||||||
| Sun |
Striped cells are hours without enough history to say.
Thursday 21:00 (5% in use), Sunday 07:00 (5% in use), Tuesday 20:00 (8% in use)
Sunday 16:00 (68% in use), Sunday 17:00 (60% in use), Sunday 11:00 (59% in use)
Track record
Share of the time its connectors were available or charging a car, across 31 days of readings.
Days when at least one connector was reported out of service, however briefly.
No trevl driver has reported on this site recently.
Questions about EH - MOTO Chieveley
Is EH - MOTO Chieveley reliable?
Very reliable: scored 100 out of 100, which reads as roughly the chance it is working when you arrive. Over the last 30 days its connectors were working 99.9% of the time we checked. At least one connector was reported out of service on 13 of the last 30 days.
When is EH - MOTO Chieveley busiest?
It is usually busiest on Sunday 16:00 (68% in use), Sunday 17:00 (60% in use), Sunday 11:00 (59% in use). The quietest daytime slots are Thursday 21:00 (5% in use), Sunday 07:00 (5% in use), Tuesday 20:00 (8% in use). Times are UK time and come from weeks of live status readings.
How much does it cost to charge at EH - MOTO Chieveley?
The operator publishes a price of 59p per kWh. Prices change, so check the operator's app or the charger itself before you plug in.
What connectors does EH - MOTO Chieveley have?
EH - MOTO Chieveley has 12 × CCS at 400 kW, 12 × CCS at 350 kW, 6 × CHAdeMO at 100 kW, 3 × CCS at 50 kW, 1 × CHAdeMO at 50 kW, 1 × Type 2 at 11 kW.
Is EH - MOTO Chieveley working right now?
29 of 35 free. Checked just now. The operator publishes live status, and trevl reads it every few minutes.
Other chargers nearby
All rapid chargers in Chieveley, ranked by reliability
- ubitricity Distributed Energy Systems UK Ltd. 23 Sorrel Close4.5 km away · 5 kW · Ubitricity
- ubitricity Distributed Energy Systems UK Ltd. 41 Wyndham Rd4.5 km away · 5 kW · Ubitricity
- ubitricity Distributed Energy Systems UK Ltd. 32 Donnington Square, Opp.4.6 km away · 5 kW · Ubitricity
- ubitricity Distributed Energy Systems UK Ltd. 55 Burchell Road4.7 km away · 5 kW · Ubitricity
- ubitricity Distributed Energy Systems UK Ltd. 8 Donnington Square4.7 km away · 5 kW · Ubitricity
- ubitricity Distributed Energy Systems UK Ltd. 34 Gaywood Drive4.8 km away · 5 kW · Ubitricity
- ubitricity Distributed Energy Systems UK Ltd. 46 Gaywood Drive4.8 km away · 5 kW · Ubitricity
- ubitricity Distributed Energy Systems UK Ltd. 7 Angel Court,4.9 km away · 5 kW · Ubitricity
Plan a route that only stops where the chargers work
trevl watches sites like this one around the clock and plans your charging stops around the ones that will be working when you arrive, whatever you drive.