EH - MOTO Donington Park, Kegworth

A42, Kegworth, DE74 2TN

GRIDSERVE-GRDUp to 360 kWLive status from the operator
At a glance

As of 23 October 2026, EH - MOTO Donington Park, Kegworth has 14 connectors up to 360 kW, run by GRIDSERVE-GRD. Its trevl reliability score is 100/100. Over the last 30 days its connectors were working 99.7% of the time, with at least one connector out of service on 13 days. It is usually busiest on Sundays at 13:00 and quietest on Mondays at 21:00 (UK time). Right now: 11 of 14 free, checked 3 minutes ago.

Reliability
100 / 100

Very reliable: scored 100 out of 100, which reads as roughly the chance it is working when you arrive.

Right now
11 of 14 free

Checked 3 minutes ago.

Price
92p per kWh

As published by the operator.

Connectors

ConnectorPowerStatus
CCS360 kWAvailable
CCS360 kWAvailable
CCS360 kWAvailable
CCS360 kWIn use
CCS360 kWIn use
CCS360 kWAvailable
CCS360 kWAvailable
CCS360 kWAvailable
CCS360 kWAvailable
CCS360 kWAvailable
CCS360 kWAvailable
CCS360 kWAvailable
CCS50 kWAvailable
CHAdeMO50 kWIn use

When it’s busy

How busy the site usually is, by day and hour (UK time). Darker means more of the working connectors are in use.

0003060912151821
Mon
Tue
Wed
Thu
Fri
Sat
Sun

Striped cells are hours without enough history to say.

QuietBusy
Usually quietest

Monday 21:00 (4% in use), Sunday 07:00 (4% in use), Monday 20:00 (6% in use)

Usually busiest

Sunday 13:00 (70% in use), Sunday 12:00 (68% in use), Sunday 17:00 (68% in use)

Track record

Last 30 days
99.7% working

Share of the time its connectors were available or charging a car, across 31 days of readings.

Days with a fault
13 of 30

Days when at least one connector was reported out of service, however briefly.

Driver reports, 90 days
0

No trevl driver has reported on this site recently.

Questions about EH - MOTO Donington Park

Is EH - MOTO Donington Park reliable?

Very reliable: scored 100 out of 100, which reads as roughly the chance it is working when you arrive. Over the last 30 days its connectors were working 99.7% of the time we checked. At least one connector was reported out of service on 13 of the last 30 days.

When is EH - MOTO Donington Park busiest?

It is usually busiest on Sunday 13:00 (70% in use), Sunday 12:00 (68% in use), Sunday 17:00 (68% in use). The quietest daytime slots are Monday 21:00 (4% in use), Sunday 07:00 (4% in use), Monday 20:00 (6% in use). Times are UK time and come from weeks of live status readings.

How much does it cost to charge at EH - MOTO Donington Park?

The operator publishes a price of 92p per kWh. Prices change, so check the operator's app or the charger itself before you plug in.

What connectors does EH - MOTO Donington Park have?

EH - MOTO Donington Park, Kegworth has 12 × CCS at 360 kW, 1 × CCS at 50 kW, 1 × CHAdeMO at 50 kW.

Is EH - MOTO Donington Park working right now?

11 of 14 free. Checked 3 minutes ago. The operator publishes live status, and trevl reads it every few minutes.

Other chargers nearby

All rapid chargers in Kegworth, ranked by reliability

Plan a route that only stops where the chargers work

trevl watches sites like this one around the clock and plans your charging stops around the ones that will be working when you arrive, whatever you drive.