EH - MOTO Reading Eastbound
M4, Reading, RG30 3UQ
As of 23 October 2026, EH - MOTO Reading Eastbound has 36 connectors up to 360 kW, run by GRIDSERVE-GRD. Its trevl reliability score is 99/100. Over the last 30 days its connectors were working 99.5% of the time, with at least one connector out of service on 11 days. It is usually busiest on Saturdays at 12:00 and quietest on Sundays at 07:00 (UK time). Right now: 33 of 36 free, checked 4 minutes ago.
Very reliable: scored 99 out of 100, which reads as roughly the chance it is working when you arrive.
Checked 4 minutes ago.
As published by the operator.
Connectors
| Connector | Power | Status |
|---|---|---|
| CCS | 360 kW | Available |
| CCS | 360 kW | Available |
| CCS | 360 kW | Available |
| CCS | 360 kW | Available |
| CCS | 360 kW | Available |
| CCS | 360 kW | In use |
| CCS | 360 kW | Available |
| CCS | 360 kW | Available |
| CCS | 360 kW | Available |
| CCS | 360 kW | Available |
| CCS | 360 kW | Available |
| CCS | 360 kW | Available |
| CCS | 350 kW | Available |
| CCS | 350 kW | Available |
| CCS | 350 kW | Available |
| CCS | 350 kW | Available |
| CCS | 350 kW | Available |
| CCS | 350 kW | Out of service |
| CCS | 350 kW | Available |
| CCS | 350 kW | Available |
| CCS | 350 kW | Available |
| CCS | 350 kW | Available |
| CCS | 350 kW | Available |
| CCS | 350 kW | Available |
| CHAdeMO | 100 kW | Available |
| CHAdeMO | 100 kW | Available |
| CHAdeMO | 100 kW | Out of service |
| CHAdeMO | 100 kW | Available |
| CHAdeMO | 100 kW | Available |
| CHAdeMO | 100 kW | Available |
| CCS | 40 kW | Available |
| CCS | 40 kW | Available |
| CCS | 40 kW | Available |
| CHAdeMO | 40 kW | Available |
| Type 2 | 11 kW | Available |
| Type 2 | 11 kW | Available |
When it’s busy
How busy the site usually is, by day and hour (UK time). Darker means more of the working connectors are in use.
| 00 | 03 | 06 | 09 | 12 | 15 | 18 | 21 | |||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Mon | ||||||||||||||||||||||||
| Tue | ||||||||||||||||||||||||
| Wed | ||||||||||||||||||||||||
| Thu | ||||||||||||||||||||||||
| Fri | ||||||||||||||||||||||||
| Sat | ||||||||||||||||||||||||
| Sun |
Striped cells are hours without enough history to say.
Sunday 07:00 (3% in use), Thursday 21:00 (4% in use), Friday 07:00 (4% in use)
Saturday 12:00 (26% in use), Friday 13:00 (22% in use), Friday 12:00 (22% in use)
Track record
Share of the time its connectors were available or charging a car, across 31 days of readings.
Days when at least one connector was reported out of service, however briefly.
No trevl driver has reported on this site recently.
Questions about EH - MOTO Reading Eastbound
Is EH - MOTO Reading Eastbound reliable?
Very reliable: scored 99 out of 100, which reads as roughly the chance it is working when you arrive. Over the last 30 days its connectors were working 99.5% of the time we checked. At least one connector was reported out of service on 11 of the last 30 days.
When is EH - MOTO Reading Eastbound busiest?
It is usually busiest on Saturday 12:00 (26% in use), Friday 13:00 (22% in use), Friday 12:00 (22% in use). The quietest daytime slots are Sunday 07:00 (3% in use), Thursday 21:00 (4% in use), Friday 07:00 (4% in use). Times are UK time and come from weeks of live status readings.
How much does it cost to charge at EH - MOTO Reading Eastbound?
The operator publishes a price of 59p per kWh. Prices change, so check the operator's app or the charger itself before you plug in.
What connectors does EH - MOTO Reading Eastbound have?
EH - MOTO Reading Eastbound has 12 × CCS at 360 kW, 12 × CCS at 350 kW, 6 × CHAdeMO at 100 kW, 3 × CCS at 40 kW, 1 × CHAdeMO at 40 kW, 2 × Type 2 at 11 kW.
Is EH - MOTO Reading Eastbound working right now?
33 of 36 free. Checked 4 minutes ago. The operator publishes live status, and trevl reads it every few minutes.
Other chargers nearby
All rapid chargers in Reading, ranked by reliability
- EH - MOTO Reading Westbound0.3 km away · 360 kW · GRIDSERVE-GRD
- Reading East SF Connect0.4 km away · 300 kW · bp pulse
- Reading West SF Connect0.5 km away · 300 kW · bp pulse
- ubitricity Distributed Energy Systems UK Ltd. 24 Carters Rise1.4 km away · 5 kW · Ubitricity
- ubitricity Distributed Energy Systems UK Ltd. 17 Bucknell Close1.6 km away · 5 kW · Ubitricity
- ubitricity Distributed Energy Systems UK Ltd. Calcot Place Drive1.8 km away · 5 kW · Ubitricity
- ubitricity Distributed Energy Systems UK Ltd. Calcot Place Drive1.8 km away · 5 kW · Ubitricity
- ubitricity Distributed Energy Systems UK Ltd. 3 Seton Drive2 km away · 5 kW · Ubitricity
Plan a route that only stops where the chargers work
trevl watches sites like this one around the clock and plans your charging stops around the ones that will be working when you arrive, whatever you drive.