EH - MOTO Stirling
Pirnhall Rd, Stirling, FK7 8EU
As of 23 October 2026, EH - MOTO Stirling has 7 connectors up to 225 kW, run by GRIDSERVE-GRD. Its trevl reliability score is 100/100. Over the last 30 days its connectors were working 100% of the time, with at least one connector out of service on 2 days. It is usually busiest on Mondays at 12:00 and quietest on Thursdays at 20:00 (UK time). Right now: 5 of 7 free, checked 2 minutes ago.
Very reliable: scored 100 out of 100, which reads as roughly the chance it is working when you arrive.
Checked 2 minutes ago.
As published by the operator.
Connectors
| Connector | Power | Status |
|---|---|---|
| CCS | 225 kW | Available |
| CCS | 225 kW | Available |
| CCS | 225 kW | In use |
| CCS | 225 kW | Available |
| CCS | 225 kW | Available |
| CCS | 225 kW | Available |
| Type 2 | 11 kW | Unknown |
When it’s busy
How busy the site usually is, by day and hour (UK time). Darker means more of the working connectors are in use.
| 00 | 03 | 06 | 09 | 12 | 15 | 18 | 21 | |||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Mon | ||||||||||||||||||||||||
| Tue | ||||||||||||||||||||||||
| Wed | ||||||||||||||||||||||||
| Thu | ||||||||||||||||||||||||
| Fri | ||||||||||||||||||||||||
| Sat | ||||||||||||||||||||||||
| Sun |
Striped cells are hours without enough history to say.
Thursday 20:00 (0% in use), Thursday 21:00 (0% in use), Friday 07:00 (0% in use)
Monday 12:00 (50% in use), Wednesday 14:00 (50% in use), Tuesday 14:00 (42% in use)
Track record
Share of the time its connectors were available or charging a car, across 31 days of readings.
Days when at least one connector was reported out of service, however briefly.
No trevl driver has reported on this site recently.
Questions about EH - MOTO Stirling
Is EH - MOTO Stirling reliable?
Very reliable: scored 100 out of 100, which reads as roughly the chance it is working when you arrive. Over the last 30 days its connectors were working 100% of the time we checked. At least one connector was reported out of service on 2 of the last 30 days.
When is EH - MOTO Stirling busiest?
It is usually busiest on Monday 12:00 (50% in use), Wednesday 14:00 (50% in use), Tuesday 14:00 (42% in use). The quietest daytime slots are Thursday 20:00 (0% in use), Thursday 21:00 (0% in use), Friday 07:00 (0% in use). Times are UK time and come from weeks of live status readings.
How much does it cost to charge at EH - MOTO Stirling?
The operator publishes a price of 59p per kWh. Prices change, so check the operator's app or the charger itself before you plug in.
What connectors does EH - MOTO Stirling have?
EH - MOTO Stirling has 6 × CCS at 225 kW, 1 × Type 2 at 11 kW.
Is EH - MOTO Stirling working right now?
5 of 7 free. Checked 2 minutes ago. The operator publishes live status, and trevl reads it every few minutes.
Other chargers nearby
All rapid chargers in Stirling, ranked by reliability
- Bannockburn Library1.6 km away · 50 kW · Charge Place Scotland
- Mount Oliphant, Cowie3.4 km away · 7 kW · Charge Place Scotland
- Stirling Community Hospital3.5 km away · 7 kW · Charge Place Scotland
- Almond Court, Braehead3.5 km away · 7 kW · Charge Place Scotland
- Balfour Centre, Plean3.6 km away · 7 kW · Charge Place Scotland
- Colquhoun Street, Stirling3.6 km away · 7 kW · Charge Place Scotland
- Endrick House4.1 km away · 7 kW · Charge Place Scotland
- Teith House4.1 km away · 7 kW · Charge Place Scotland
Plan a route that only stops where the chargers work
trevl watches sites like this one around the clock and plans your charging stops around the ones that will be working when you arrive, whatever you drive.