Fields at Aylesford, Maidstone
St Laurence Avenue, Maidstone, ME16 0ZP
As of 24 October 2026, Fields at Aylesford, Maidstone has 9 connectors up to 200 kW, run by Osprey Charging. Its trevl reliability score is 92/100. Over the last 30 days its connectors were working 100% of the time, with no faults reported. It is usually busiest on Wednesdays at 16:00 and quietest on Mondays at 09:00 (UK time). Right now: 9 of 9 free, checked 2 minutes ago.
Very reliable: scored 92 out of 100, which reads as roughly the chance it is working when you arrive.
Checked 2 minutes ago.
The operator doesn’t publish a price we can show.
Connectors
| Connector | Power | Status |
|---|---|---|
| CCS | 200 kW | Available |
| CCS | 200 kW | Available |
| CCS | 200 kW | Available |
| CCS | 200 kW | Available |
| CCS | 50 kW | Available |
| CCS | 50 kW | Available |
| CHAdeMO | 50 kW | Available |
| Type 2 | 16 kW | Available |
| Type 2 | 16 kW | Available |
When it’s busy
How busy the site usually is, by day and hour (UK time). Darker means more of the working connectors are in use.
| 00 | 03 | 06 | 09 | 12 | 15 | 18 | 21 | |||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Mon | ||||||||||||||||||||||||
| Tue | ||||||||||||||||||||||||
| Wed | ||||||||||||||||||||||||
| Thu | ||||||||||||||||||||||||
| Fri | ||||||||||||||||||||||||
| Sat | ||||||||||||||||||||||||
| Sun |
Striped cells are hours without enough history to say.
Monday 09:00 (0% in use), Monday 20:00 (0% in use), Monday 21:00 (0% in use)
Wednesday 16:00 (30% in use), Monday 15:00 (25% in use), Tuesday 12:00 (22% in use)
Track record
Share of the time its connectors were available or charging a car, across 31 days of readings.
Days when at least one connector was reported out of service, however briefly.
No trevl driver has reported on this site recently.
Questions about Fields at Aylesford, Maidstone
Is Fields at Aylesford, Maidstone reliable?
Very reliable: scored 92 out of 100, which reads as roughly the chance it is working when you arrive. Over the last 30 days its connectors were working 100% of the time we checked. No connector was reported out of service in the last 30 days.
When is Fields at Aylesford, Maidstone busiest?
It is usually busiest on Wednesday 16:00 (30% in use), Monday 15:00 (25% in use), Tuesday 12:00 (22% in use). The quietest daytime slots are Monday 09:00 (0% in use), Monday 20:00 (0% in use), Monday 21:00 (0% in use). Times are UK time and come from weeks of live status readings.
How much does it cost to charge at Fields at Aylesford, Maidstone?
The operator doesn't publish a price we can show. Check its app or the charger itself before you plug in.
What connectors does Fields at Aylesford, Maidstone have?
Fields at Aylesford, Maidstone has 4 × CCS at 200 kW, 2 × CCS at 50 kW, 1 × CHAdeMO at 50 kW, 2 × Type 2 at 16 kW.
Is Fields at Aylesford, Maidstone working right now?
9 of 9 free. Checked 2 minutes ago. The operator publishes live status, and trevl reads it every few minutes.
Other chargers nearby
All rapid chargers in Maidstone, ranked by reliability
- Pod Point DHL Exel Supply Chain Ltd0.6 km away · 22 kW · Pod Point
- Pod Point South Aylesford Retail Park1.2 km away · 7 kW · Pod Point
- Miller & Carter Maidstone2.4 km away · 50 kW · bp pulse
- Pod Point Wickes Maidstone2.6 km away · 7 kW · Pod Point
- Pod Point King Street Car Park3.2 km away · 7 kW · Pod Point
- Pod Point Union Street Car Park3.4 km away · 7 kW · Pod Point
- Morrisons Larkfield3.4 km away · 50 kW · MFG EV Power
- Shell Recharge Shell Bluebell Hill3.5 km away · 180 kW · Shell Recharge
Plan a route that only stops where the chargers work
trevl watches sites like this one around the clock and plans your charging stops around the ones that will be working when you arrive, whatever you drive.