Fife Renewables Innovation Centre - Innerleven
Ajax Way, Leven, KY8 3RS
As of 24 October 2026, Fife Renewables Innovation Centre - Innerleven has 2 connectors up to 7 kW, run by Charge Place Scotland. Its trevl reliability score is 96/100. Over the last 30 days its connectors were working 100% of the time, with no faults reported. It is usually busiest on Mondays at 09:00 and quietest on Mondays at 07:00 (UK time). Right now: 2 of 2 free, checked 3 minutes ago.
Very reliable: scored 96 out of 100, which reads as roughly the chance it is working when you arrive.
Checked 3 minutes ago.
The operator doesn’t publish a price we can show.
Connectors
| Connector | Power | Status |
|---|---|---|
| Type 2 | 7 kW | Available |
| Type 2 | 7 kW | Available |
When it’s busy
How busy the site usually is, by day and hour (UK time). Darker means more of the working connectors are in use.
| 00 | 03 | 06 | 09 | 12 | 15 | 18 | 21 | |||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Mon | ||||||||||||||||||||||||
| Tue | ||||||||||||||||||||||||
| Wed | ||||||||||||||||||||||||
| Thu | ||||||||||||||||||||||||
| Fri | ||||||||||||||||||||||||
| Sat | ||||||||||||||||||||||||
| Sun |
Striped cells are hours without enough history to say.
Monday 07:00 (0% in use), Monday 17:00 (0% in use), Monday 18:00 (0% in use)
Monday 09:00 (50% in use), Monday 10:00 (50% in use), Monday 11:00 (50% in use)
Track record
Share of the time its connectors were available or charging a car, across 31 days of readings.
Days when at least one connector was reported out of service, however briefly.
No trevl driver has reported on this site recently.
Questions about Fife Renewables Innovation Centre - Innerleven
Is Fife Renewables Innovation Centre - Innerleven reliable?
Very reliable: scored 96 out of 100, which reads as roughly the chance it is working when you arrive. Over the last 30 days its connectors were working 100% of the time we checked. No connector was reported out of service in the last 30 days.
When is Fife Renewables Innovation Centre - Innerleven busiest?
It is usually busiest on Monday 09:00 (50% in use), Monday 10:00 (50% in use), Monday 11:00 (50% in use). The quietest daytime slots are Monday 07:00 (0% in use), Monday 17:00 (0% in use), Monday 18:00 (0% in use). Times are UK time and come from weeks of live status readings.
How much does it cost to charge at Fife Renewables Innovation Centre - Innerleven?
The operator doesn't publish a price we can show. Check its app or the charger itself before you plug in.
What connectors does Fife Renewables Innovation Centre - Innerleven have?
Fife Renewables Innovation Centre - Innerleven has 2 × Type 2 at 7 kW.
Is Fife Renewables Innovation Centre - Innerleven working right now?
2 of 2 free. Checked 3 minutes ago. The operator publishes live status, and trevl reads it every few minutes.
Other chargers nearby
All rapid chargers in Glenrothes, ranked by reliability
- Leven Rail Station Car Park0.8 km away · 7 kW · Charge Place Scotland
- South Street Car Park, Leven0.8 km away · 7 kW · Charge Place Scotland
- College Street Car Park, Buckhaven2.7 km away · 22 kW · Charge Place Scotland
- Cameronbridge Station2.9 km away · 7 kW · Charge Place Scotland
- Homelands Trust-Fife, Lundin Links, Fife3.9 km away · 22 kW · Charge Place Scotland
- The Temple Car Park, Lower Largo5.1 km away · 22 kW · Charge Place Scotland
- Markinch Rail Station Car Park, Markinch8.3 km away · 7 kW · Charge Place Scotland
- Bankhead Central, Bankhead Park, Glenrothes8.9 km away · 50 kW · Charge Place Scotland
Plan a route that only stops where the chargers work
trevl watches sites like this one around the clock and plans your charging stops around the ones that will be working when you arrive, whatever you drive.