George Gravesend A2 Singlewell

Best Western Manor Hotel, 1 Hever Ct Rd, Sing, Gravesend, DA12 5UQ

bp pulseUp to 50 kWLive status from the operator
At a glance

As of 23 October 2026, George Gravesend A2 Singlewell has 3 connectors up to 50 kW, run by bp pulse. Its trevl reliability score is 98/100. Over the last 30 days its connectors were working 100% of the time, with no faults reported. It is usually busiest on Thursdays at 11:00 and quietest on Mondays at 08:00 (UK time). Right now: all in use, checked just now.

Reliability
98 / 100

Very reliable: scored 98 out of 100, which reads as roughly the chance it is working when you arrive.

Right now
All in use

Checked just now.

Price
74.2p per kWh

As published by the operator.

Connectors

ConnectorPowerStatus
CCS50 kWIn use
CHAdeMO50 kWIn use
Type 243.6 kWIn use

When it’s busy

How busy the site usually is, by day and hour (UK time). Darker means more of the working connectors are in use.

0003060912151821
Mon
Tue
Wed
Thu
Fri
Sat
Sun

Striped cells are hours without enough history to say.

QuietBusy
Usually quietest

Monday 08:00 (0% in use), Monday 09:00 (0% in use), Monday 11:00 (0% in use)

Usually busiest

Thursday 11:00 (64% in use), Friday 15:00 (44% in use), Thursday 08:00 (44% in use)

Track record

Last 30 days
100% working

Share of the time its connectors were available or charging a car, across 31 days of readings.

Days with a fault
0 of 30

Days when at least one connector was reported out of service, however briefly.

Driver reports, 90 days
0

No trevl driver has reported on this site recently.

Questions about George Gravesend A2 Singlewell

Is George Gravesend A2 Singlewell reliable?

Very reliable: scored 98 out of 100, which reads as roughly the chance it is working when you arrive. Over the last 30 days its connectors were working 100% of the time we checked. No connector was reported out of service in the last 30 days.

When is George Gravesend A2 Singlewell busiest?

It is usually busiest on Thursday 11:00 (64% in use), Friday 15:00 (44% in use), Thursday 08:00 (44% in use). The quietest daytime slots are Monday 08:00 (0% in use), Monday 09:00 (0% in use), Monday 11:00 (0% in use). Times are UK time and come from weeks of live status readings.

How much does it cost to charge at George Gravesend A2 Singlewell?

The operator publishes a price of 74.2p per kWh. Prices change, so check the operator's app or the charger itself before you plug in.

What connectors does George Gravesend A2 Singlewell have?

George Gravesend A2 Singlewell has 1 × CCS at 50 kW, 1 × CHAdeMO at 50 kW, 1 × Type 2 at 43.6 kW.

Is George Gravesend A2 Singlewell working right now?

All in use. Checked just now. The operator publishes live status, and trevl reads it every few minutes.

Other chargers nearby

All rapid chargers in Gravesend, ranked by reliability

Plan a route that only stops where the chargers work

trevl watches sites like this one around the clock and plans your charging stops around the ones that will be working when you arrive, whatever you drive.