As of 23 October 2026, Halbeath Depot, Crossgates Road has 3 connectors up to 50 kW, run by Charge Place Scotland. Its trevl reliability score is 97/100. Over the last 30 days its connectors were working 98.7% of the time, with at least one connector out of service on 23 days. It is usually busiest on Mondays at 10:00 and quietest on Mondays at 07:00 (UK time). Right now: 3 of 3 free, checked just now.
Very reliable: scored 97 out of 100, which reads as roughly the chance it is working when you arrive.
Checked just now.
As published by the operator.
Connectors
| Connector | Power | Status |
|---|---|---|
| CCS | 50 kW | Available |
| CHAdeMO | 50 kW | Available |
| Type 2 | 22 kW | Available |
When it’s busy
How busy the site usually is, by day and hour (UK time). Darker means more of the working connectors are in use.
| 00 | 03 | 06 | 09 | 12 | 15 | 18 | 21 | |||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Mon | ||||||||||||||||||||||||
| Tue | ||||||||||||||||||||||||
| Wed | ||||||||||||||||||||||||
| Thu | ||||||||||||||||||||||||
| Fri | ||||||||||||||||||||||||
| Sat | ||||||||||||||||||||||||
| Sun |
Striped cells are hours without enough history to say.
Monday 07:00 (0% in use), Monday 08:00 (0% in use), Monday 09:00 (0% in use)
Monday 10:00 (9% in use), Monday 07:00 (0% in use), Monday 08:00 (0% in use)
Track record
Share of the time its connectors were available or charging a car, across 31 days of readings.
Days when at least one connector was reported out of service, however briefly.
No trevl driver has reported on this site recently.
Questions about Halbeath Depot
Is Halbeath Depot reliable?
Very reliable: scored 97 out of 100, which reads as roughly the chance it is working when you arrive. Over the last 30 days its connectors were working 98.7% of the time we checked. At least one connector was reported out of service on 23 of the last 30 days.
When is Halbeath Depot busiest?
It is usually busiest on Monday 10:00 (9% in use), Monday 07:00 (0% in use), Monday 08:00 (0% in use). The quietest daytime slots are Monday 07:00 (0% in use), Monday 08:00 (0% in use), Monday 09:00 (0% in use). Times are UK time and come from weeks of live status readings.
How much does it cost to charge at Halbeath Depot?
The operator publishes a price of 60p per kWh. Prices change, so check the operator's app or the charger itself before you plug in.
What connectors does Halbeath Depot have?
Halbeath Depot, Crossgates Road has 1 × CCS at 50 kW, 1 × CHAdeMO at 50 kW, 1 × Type 2 at 22 kW.
Is Halbeath Depot working right now?
3 of 3 free. Checked just now. The operator publishes live status, and trevl reads it every few minutes.
Other chargers nearby
All rapid chargers in Halbeath, ranked by reliability
- Halbeath Park and Ride0.4 km away · 50 kW · Charge Place Scotland
- Premier Inn Dunfermline0.6 km away · 50 kW · GeniePoint
- HU - Dobbies Dunfermline0.7 km away · 180 kW · GRIDSERVE-GRD
- Dunfermline Learning Campus Woodmill & St Columbus1.2 km away · 22 kW · Charge Place Scotland
- Dunfermline Queen Margaret Rail Halt Car Park, Dunfermline1.8 km away · 7 kW · Charge Place Scotland
- Fife Interchange North1.9 km away · 50 kW · Charge Place Scotland
- Queen Margaret Hospital (Car Park 2), Dunfermline2.1 km away · 22 kW · Charge Place Scotland
- Pod Point Tesco Extra - Dunfermline2.5 km away · 7 kW · Pod Point