Hucknall Park & Ride, Nottingham
Hucknall Park & Ride, Ashgate Road, Hucknall, Nottingham, NG15 7TD
As of 23 October 2026, Hucknall Park & Ride, Nottingham has 8 connectors up to 7.4 kW, run by bp pulse. Its trevl reliability score is 51/100. Over the last 30 days its connectors were working 51.2% of the time, with at least one connector out of service on 31 days. It is usually busiest on Wednesdays at 14:00 and quietest on Mondays at 07:00 (UK time). Right now: 5 of 8 free, checked just now.
Unreliable: scored 51 out of 100, which reads as roughly the chance it is working when you arrive.
Checked just now.
As published by the operator.
Connectors
| Connector | Power | Status |
|---|---|---|
| Type 2 | 7.4 kW | Available |
| Type 2 | 7.4 kW | Out of service |
| Type 2 | 7.4 kW | Out of service |
| Type 2 | 7.4 kW | Available |
| Type 2 | 7.4 kW | Available |
| Type 2 | 7.4 kW | Available |
| Type 2 | 7.4 kW | Available |
| Type 2 | 7.4 kW | Out of service |
When it’s busy
How busy the site usually is, by day and hour (UK time). Darker means more of the working connectors are in use.
| 00 | 03 | 06 | 09 | 12 | 15 | 18 | 21 | |||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Mon | ||||||||||||||||||||||||
| Tue | ||||||||||||||||||||||||
| Wed | ||||||||||||||||||||||||
| Thu | ||||||||||||||||||||||||
| Fri | ||||||||||||||||||||||||
| Sat | ||||||||||||||||||||||||
| Sun |
Striped cells are hours without enough history to say.
Monday 07:00 (0% in use), Monday 08:00 (0% in use), Monday 09:00 (0% in use)
Wednesday 14:00 (20% in use), Wednesday 15:00 (20% in use), Wednesday 16:00 (20% in use)
Track record
Share of the time its connectors were available or charging a car, across 31 days of readings.
Days when at least one connector was reported out of service, however briefly.
No trevl driver has reported on this site recently.
Questions about Hucknall Park & Ride
Is Hucknall Park & Ride reliable?
Unreliable: scored 51 out of 100, which reads as roughly the chance it is working when you arrive. Over the last 30 days its connectors were working 51.2% of the time we checked. At least one connector was reported out of service on 31 of the last 30 days.
When is Hucknall Park & Ride busiest?
It is usually busiest on Wednesday 14:00 (20% in use), Wednesday 15:00 (20% in use), Wednesday 16:00 (20% in use). The quietest daytime slots are Monday 07:00 (0% in use), Monday 08:00 (0% in use), Monday 09:00 (0% in use). Times are UK time and come from weeks of live status readings.
How much does it cost to charge at Hucknall Park & Ride?
The operator publishes a price of 54.2p per kWh. Prices change, so check the operator's app or the charger itself before you plug in.
What connectors does Hucknall Park & Ride have?
Hucknall Park & Ride, Nottingham has 8 × Type 2 at 7.4 kW.
Is Hucknall Park & Ride working right now?
5 of 8 free. Checked just now. The operator publishes live status, and trevl reads it every few minutes.
Other chargers nearby
All rapid chargers in Nottingham, ranked by reliability
- Pod Point Tesco Extra - Nottingham Hucknall0.2 km away · 50 kW · Pod Point
- Piggins Croft Car Park0.5 km away · 50 kW · bp pulse
- Ken Martin Leisure Centre3.3 km away · 7.4 kW · bp pulse
- Pod Point HomeServe - Nottingham3.7 km away · 7 kW · Pod Point
- MFG Sellers Wood3.7 km away · 50 kW · MFG EV Power
- Pod Point Tesco Extra - Bulwell3.9 km away · 7 kW · Pod Point
- Duke Street Car Park East4 km away · 50 kW · bp pulse
- Snapewood Community Centre4 km away · 50 kW · bp pulse
Plan a route that only stops where the chargers work
trevl watches sites like this one around the clock and plans your charging stops around the ones that will be working when you arrive, whatever you drive.