Malling SF Connect, Lewes
96-106 Malling Street, Lewes, BN7 2RJ
As of 23 October 2026, Malling SF Connect, Lewes has 2 connectors up to 150 kW, run by bp pulse. Its trevl reliability score is 94/100. Over the last 30 days its connectors were working 97.9% of the time, with at least one connector out of service on 30 days. It is usually busiest on Saturdays at 10:00 and quietest on Mondays at 08:00 (UK time). Right now: 2 of 2 free, checked just now.
Very reliable: scored 94 out of 100, which reads as roughly the chance it is working when you arrive.
Checked just now.
The operator doesn’t publish a price we can show.
Connectors
| Connector | Power | Status |
|---|---|---|
| CCS | 150 kW | Available |
| CCS | 150 kW | Available |
When it’s busy
How busy the site usually is, by day and hour (UK time). Darker means more of the working connectors are in use.
| 00 | 03 | 06 | 09 | 12 | 15 | 18 | 21 | |||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Mon | ||||||||||||||||||||||||
| Tue | ||||||||||||||||||||||||
| Wed | ||||||||||||||||||||||||
| Thu | ||||||||||||||||||||||||
| Fri | ||||||||||||||||||||||||
| Sat | ||||||||||||||||||||||||
| Sun |
Striped cells are hours without enough history to say.
Monday 08:00 (0% in use), Monday 13:00 (0% in use), Monday 15:00 (0% in use)
Saturday 10:00 (37% in use), Friday 08:00 (35% in use), Thursday 15:00 (33% in use)
Track record
Share of the time its connectors were available or charging a car, across 31 days of readings.
Days when at least one connector was reported out of service, however briefly.
No trevl driver has reported on this site recently.
Questions about Malling SF Connect
Is Malling SF Connect reliable?
Very reliable: scored 94 out of 100, which reads as roughly the chance it is working when you arrive. Over the last 30 days its connectors were working 97.9% of the time we checked. At least one connector was reported out of service on 30 of the last 30 days.
When is Malling SF Connect busiest?
It is usually busiest on Saturday 10:00 (37% in use), Friday 08:00 (35% in use), Thursday 15:00 (33% in use). The quietest daytime slots are Monday 08:00 (0% in use), Monday 13:00 (0% in use), Monday 15:00 (0% in use). Times are UK time and come from weeks of live status readings.
How much does it cost to charge at Malling SF Connect?
The operator doesn't publish a price we can show. Check its app or the charger itself before you plug in.
What connectors does Malling SF Connect have?
Malling SF Connect, Lewes has 2 × CCS at 150 kW.
Is Malling SF Connect working right now?
2 of 2 free. Checked just now. The operator publishes live status, and trevl reads it every few minutes.
Other chargers nearby
All rapid chargers in Lewes, ranked by reliability
- Pod Point Tesco Superstore - Lewes0.4 km away · 7 kW · Pod Point
- Pod Point Glyndebourne Production Hub3 km away · 7 kW · Pod Point
- Pod Point Glyndebourne Audience Car Park3.1 km away · 7 kW · Pod Point
- Pod Point Cooksbridge Railway Station3.6 km away · 7 kW · Pod Point
- Pod Point BEC - Beechwood Hall3.7 km away · 7 kW · Pod Point
- Kings Academy Ringmer3.9 km away · 50 kW · bp pulse
- 9 Sherrington Road7.3 km away · 4.1 kW · char.gy
- 285 Bexhill Road7.3 km away · 4.1 kW · char.gy
Plan a route that only stops where the chargers work
trevl watches sites like this one around the clock and plans your charging stops around the ones that will be working when you arrive, whatever you drive.