MFG Newbridge, Edinburgh
1 Clifton Hall Road, Edinburgh, EH28 8PW
As of 24 October 2026, MFG Newbridge, Edinburgh has 10 connectors up to 150 kW, run by MFG EV Power. Its trevl reliability score is 81/100. Over the last 30 days its connectors were working 81.1% of the time, with at least one connector out of service on 31 days. It is usually busiest on Wednesdays at 12:00 and quietest on Sundays at 07:00 (UK time). Right now: 10 of 10 free, checked 5 minutes ago.
Reliable: scored 81 out of 100, which reads as roughly the chance it is working when you arrive.
Checked 5 minutes ago.
As published by the operator.
Connectors
| Connector | Power | Status |
|---|---|---|
| CCS | 150 kW | Available |
| CCS | 150 kW | Available |
| CCS | 150 kW | Available |
| CCS | 150 kW | Available |
| CCS | 150 kW | Available |
| CHAdeMO | 50 kW | Available |
| CHAdeMO | 50 kW | Available |
| CHAdeMO | 50 kW | Available |
| CHAdeMO | 50 kW | Available |
| CHAdeMO | 50 kW | Available |
When it’s busy
How busy the site usually is, by day and hour (UK time). Darker means more of the working connectors are in use.
| 00 | 03 | 06 | 09 | 12 | 15 | 18 | 21 | |||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Mon | ||||||||||||||||||||||||
| Tue | ||||||||||||||||||||||||
| Wed | ||||||||||||||||||||||||
| Thu | ||||||||||||||||||||||||
| Fri | ||||||||||||||||||||||||
| Sat | ||||||||||||||||||||||||
| Sun |
Striped cells are hours without enough history to say.
Sunday 07:00 (3% in use), Tuesday 21:00 (6% in use), Tuesday 08:00 (7% in use)
Wednesday 12:00 (46% in use), Friday 12:00 (43% in use), Saturday 16:00 (43% in use)
Track record
Share of the time its connectors were available or charging a car, across 31 days of readings.
Days when at least one connector was reported out of service, however briefly.
No trevl driver has reported on this site recently.
Questions about MFG Newbridge
Is MFG Newbridge reliable?
Reliable: scored 81 out of 100, which reads as roughly the chance it is working when you arrive. Over the last 30 days its connectors were working 81.1% of the time we checked. At least one connector was reported out of service on 31 of the last 30 days.
When is MFG Newbridge busiest?
It is usually busiest on Wednesday 12:00 (46% in use), Friday 12:00 (43% in use), Saturday 16:00 (43% in use). The quietest daytime slots are Sunday 07:00 (3% in use), Tuesday 21:00 (6% in use), Tuesday 08:00 (7% in use). Times are UK time and come from weeks of live status readings.
How much does it cost to charge at MFG Newbridge?
The operator publishes a price of 59p per kWh. Prices change, so check the operator's app or the charger itself before you plug in.
What connectors does MFG Newbridge have?
MFG Newbridge, Edinburgh has 5 × CCS at 150 kW, 5 × CHAdeMO at 50 kW.
Is MFG Newbridge working right now?
10 of 10 free. Checked 5 minutes ago. The operator publishes live status, and trevl reads it every few minutes.
Other chargers nearby
All rapid chargers in Edinburgh, ranked by reliability
- Pod Point Western Nissan0.4 km away · 7 kW · Pod Point
- Ingliston SF Connect2.3 km away · 150 kW · bp pulse
- Ingliston Park & Ride3 km away · 50 kW · Charge Place Scotland
- Loccie Road - Winchburgh4.2 km away · 7 kW · Charge Place Scotland
- Calderwood Primary School4.6 km away · 50 kW · Charge Place Scotland
- Pod Point Tesco Superstore - South Queensferry5.1 km away · 7 kW · Pod Point
- Strathbrock Partnership Centre EV Chargers5.2 km away · 51 kW · Charge Place Scotland
- Forth View SF Connect5.2 km away · 150 kW · bp pulse
Plan a route that only stops where the chargers work
trevl watches sites like this one around the clock and plans your charging stops around the ones that will be working when you arrive, whatever you drive.