Morrisons Barrow-in-Furness
the Strand, Barrow-in-Furness, LA14 2HF
As of 23 October 2026, Morrisons Barrow-in-Furness has 2 connectors up to 50 kW, run by MFG EV Power. Its trevl reliability score is 94/100. Over the last 30 days its connectors were working 97.4% of the time, with at least one connector out of service on 9 days. It is usually busiest on Tuesdays at 10:00 and quietest on Mondays at 07:00 (UK time). Right now: 1 of 2 free, checked just now.
Very reliable: scored 94 out of 100, which reads as roughly the chance it is working when you arrive.
Checked just now.
As published by the operator.
Connectors
| Connector | Power | Status |
|---|---|---|
| CCS | 50 kW | Available |
| CCS | 50 kW | Out of service |
When it’s busy
How busy the site usually is, by day and hour (UK time). Darker means more of the working connectors are in use.
| 00 | 03 | 06 | 09 | 12 | 15 | 18 | 21 | |||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Mon | ||||||||||||||||||||||||
| Tue | ||||||||||||||||||||||||
| Wed | ||||||||||||||||||||||||
| Thu | ||||||||||||||||||||||||
| Fri | ||||||||||||||||||||||||
| Sat | ||||||||||||||||||||||||
| Sun |
Striped cells are hours without enough history to say.
Monday 07:00 (0% in use), Monday 19:00 (0% in use), Monday 20:00 (0% in use)
Tuesday 10:00 (100% in use), Tuesday 13:00 (75% in use), Tuesday 09:00 (69% in use)
Track record
Share of the time its connectors were available or charging a car, across 31 days of readings.
Days when at least one connector was reported out of service, however briefly.
No trevl driver has reported on this site recently.
Questions about Morrisons Barrow-in-Furness
Is Morrisons Barrow-in-Furness reliable?
Very reliable: scored 94 out of 100, which reads as roughly the chance it is working when you arrive. Over the last 30 days its connectors were working 97.4% of the time we checked. At least one connector was reported out of service on 9 of the last 30 days.
When is Morrisons Barrow-in-Furness busiest?
It is usually busiest on Tuesday 10:00 (100% in use), Tuesday 13:00 (75% in use), Tuesday 09:00 (69% in use). The quietest daytime slots are Monday 07:00 (0% in use), Monday 19:00 (0% in use), Monday 20:00 (0% in use). Times are UK time and come from weeks of live status readings.
How much does it cost to charge at Morrisons Barrow-in-Furness?
The operator publishes a price of 59p per kWh. Prices change, so check the operator's app or the charger itself before you plug in.
What connectors does Morrisons Barrow-in-Furness have?
Morrisons Barrow-in-Furness has 2 × CCS at 50 kW.
Is Morrisons Barrow-in-Furness working right now?
1 of 2 free. Checked just now. The operator publishes live status, and trevl reads it every few minutes.
Other chargers nearby
All rapid chargers in Barrow In Furness, ranked by reliability
- Instavolt Hindpool Retail Park0.8 km away · 120 kW · InstaVolt Ltd
- Pod Point Tesco Extra - Barrow-In-Furness0.8 km away · 7 kW · Pod Point
- Premier Inn Barrow in Furness1 km away · 50 kW · GeniePoint
- Evpoint Asda Barrow1.6 km away · 120 kW · EV Point Moldova
- Walney School2.2 km away · 22 kW · EO Charging
- West Point House2.5 km away · 22 kW · EO Charging
Plan a route that only stops where the chargers work
trevl watches sites like this one around the clock and plans your charging stops around the ones that will be working when you arrive, whatever you drive.