Ness Walk Hotel - DC 1, Inverness
Ness Walk, Inverness, IV3 5SQ
As of 24 October 2026, Ness Walk Hotel - DC 1, Inverness has 3 connectors up to 50 kW, run by Clenergy. Its trevl reliability score is 96/100. Over the last 30 days its connectors were working 98.9% of the time, with at least one connector out of service on 2 days. It is usually busiest on Mondays at 09:00 and quietest on Mondays at 07:00 (UK time). Right now: status unknown, checked on 28 September 2026.
Very reliable: scored 96 out of 100, which reads as roughly the chance it is working when you arrive.
Checked on 28 September 2026.
As published by the operator.
Connectors
| Connector | Power | Status |
|---|---|---|
| CCS | 50 kW | Unknown |
| CHAdeMO | 50 kW | Unknown |
| Type 2 | 22.1 kW | Unknown |
When it’s busy
How busy the site usually is, by day and hour (UK time). Darker means more of the working connectors are in use.
| 00 | 03 | 06 | 09 | 12 | 15 | 18 | 21 | |||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Mon | ||||||||||||||||||||||||
| Tue | ||||||||||||||||||||||||
| Wed | ||||||||||||||||||||||||
| Thu | ||||||||||||||||||||||||
| Fri | ||||||||||||||||||||||||
| Sat | ||||||||||||||||||||||||
| Sun |
Striped cells are hours without enough history to say.
Monday 07:00 (0% in use), Monday 08:00 (0% in use), Monday 11:00 (0% in use)
Monday 09:00 (19% in use), Monday 10:00 (13% in use), Monday 07:00 (0% in use)
Track record
Share of the time its connectors were available or charging a car, across 5 days of readings.
Days when at least one connector was reported out of service, however briefly.
No trevl driver has reported on this site recently.
Questions about Ness Walk Hotel - DC 1
Is Ness Walk Hotel - DC 1 reliable?
Very reliable: scored 96 out of 100, which reads as roughly the chance it is working when you arrive. Over the last 30 days its connectors were working 98.9% of the time we checked. At least one connector was reported out of service on 2 of the last 30 days.
When is Ness Walk Hotel - DC 1 busiest?
It is usually busiest on Monday 09:00 (19% in use), Monday 10:00 (13% in use), Monday 07:00 (0% in use). The quietest daytime slots are Monday 07:00 (0% in use), Monday 08:00 (0% in use), Monday 11:00 (0% in use). Times are UK time and come from weeks of live status readings.
How much does it cost to charge at Ness Walk Hotel - DC 1?
The operator publishes a price of 45.8p per kWh. Prices change, so check the operator's app or the charger itself before you plug in.
What connectors does Ness Walk Hotel - DC 1 have?
Ness Walk Hotel - DC 1, Inverness has 1 × CCS at 50 kW, 1 × CHAdeMO at 50 kW, 1 × Type 2 at 22.1 kW.
Is Ness Walk Hotel - DC 1 working right now?
Status unknown. Checked on 28 September 2026. The operator publishes live status, and trevl reads it every few minutes.
Other chargers nearby
All rapid chargers in Inverness, ranked by reliability
- Ness Walk Hotel - DC 20 km away · 50 kW · Clenergy
- Ness Walk Hotel0 km away · 6.9 kW · Clenergy
- Ness Walk Hotel0 km away · 6.9 kW · Clenergy
- Ness Walk Hotel0 km away · 6.9 kW · Clenergy
- Ness Walk Hotel0 km away · 6.9 kW · Clenergy
- Ness Walk Hotel0 km away · 6.9 kW · Clenergy
- Ness Walk Hotel0 km away · 6.9 kW · Clenergy
- Ness Walk Hotel0 km away · 6.9 kW · Clenergy
Plan a route that only stops where the chargers work
trevl watches sites like this one around the clock and plans your charging stops around the ones that will be working when you arrive, whatever you drive.