Pepper Mill, Stoke-on-Trent
Longton, Stoke-on-Trent, ST3 2JB
As of 23 October 2026, Pepper Mill, Stoke-on-Trent has 6 connectors up to 50 kW, run by Osprey Charging. Its trevl reliability score is 100/100. Over the last 30 days its connectors were working 100% of the time, with at least one connector out of service on 3 days. It is usually busiest on Mondays at 11:00 and quietest on Mondays at 07:00 (UK time). Right now: 6 of 6 free, checked just now.
Very reliable: scored 100 out of 100, which reads as roughly the chance it is working when you arrive.
Checked just now.
The operator doesn’t publish a price we can show.
Connectors
| Connector | Power | Status |
|---|---|---|
| CCS | 50 kW | Available |
| CCS | 50 kW | Available |
| CHAdeMO | 50 kW | Available |
| CHAdeMO | 50 kW | Available |
| Type 2 | 16 kW | Available |
| Type 2 | 16 kW | Available |
When it’s busy
How busy the site usually is, by day and hour (UK time). Darker means more of the working connectors are in use.
| 00 | 03 | 06 | 09 | 12 | 15 | 18 | 21 | |||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Mon | ||||||||||||||||||||||||
| Tue | ||||||||||||||||||||||||
| Wed | ||||||||||||||||||||||||
| Thu | ||||||||||||||||||||||||
| Fri | ||||||||||||||||||||||||
| Sat | ||||||||||||||||||||||||
| Sun |
Striped cells are hours without enough history to say.
Monday 07:00 (0% in use), Monday 08:00 (0% in use), Monday 09:00 (0% in use)
Monday 11:00 (14% in use), Saturday 14:00 (9% in use), Monday 12:00 (5% in use)
Track record
Share of the time its connectors were available or charging a car, across 31 days of readings.
Days when at least one connector was reported out of service, however briefly.
No trevl driver has reported on this site recently.
Questions about Pepper Mill, Stoke-on-Trent
Is Pepper Mill, Stoke-on-Trent reliable?
Very reliable: scored 100 out of 100, which reads as roughly the chance it is working when you arrive. Over the last 30 days its connectors were working 100% of the time we checked. At least one connector was reported out of service on 3 of the last 30 days.
When is Pepper Mill, Stoke-on-Trent busiest?
It is usually busiest on Monday 11:00 (14% in use), Saturday 14:00 (9% in use), Monday 12:00 (5% in use). The quietest daytime slots are Monday 07:00 (0% in use), Monday 08:00 (0% in use), Monday 09:00 (0% in use). Times are UK time and come from weeks of live status readings.
How much does it cost to charge at Pepper Mill, Stoke-on-Trent?
The operator doesn't publish a price we can show. Check its app or the charger itself before you plug in.
What connectors does Pepper Mill, Stoke-on-Trent have?
Pepper Mill, Stoke-on-Trent has 2 × CCS at 50 kW, 2 × CHAdeMO at 50 kW, 2 × Type 2 at 16 kW.
Is Pepper Mill, Stoke-on-Trent working right now?
6 of 6 free. Checked just now. The operator publishes live status, and trevl reads it every few minutes.
Other chargers nearby
All rapid chargers in Stoke-on-Trent, ranked by reliability
- Phoenix Retail Park, Stoke-on-Trent0.2 km away · 300 kW · Osprey Charging
- Pod Point Tesco Extra - Longton0.4 km away · 7 kW · Pod Point
- Pod Point Longton Primary Care - Greendock Street0.5 km away · 7 kW · Pod Point
- Baths Road0.6 km away · 300 kW · bp pulse
- Harvester Trentham Lakes1.8 km away · 50 kW · bp pulse
- Pod Point Nissan Holdcroft Stoke-On-Trent3.8 km away · 7 kW · Pod Point
- MFG Meir3.9 km away · 300 kW · MFG EV Power
- Pod Point Tesco Superstore - Meir Stoke-on-Trent4.3 km away · 7 kW · Pod Point
Plan a route that only stops where the chargers work
trevl watches sites like this one around the clock and plans your charging stops around the ones that will be working when you arrive, whatever you drive.