Pod Point Neuadd Bridge Caravan Park, Powys

Llanfair Caereinion Welshpool, Powys, SY21 0HX

Pod PointUp to 22 kWLive status from the operator
At a glance

As of 24 October 2026, Pod Point Neuadd Bridge Caravan Park, Powys has 4 connectors up to 22 kW, run by Pod Point. Its trevl reliability score is 50/100. Over the last 30 days its connectors were working 50% of the time, with at least one connector out of service on 31 days. It is usually busiest on Fridays at 19:00 and quietest on Mondays at 07:00 (UK time). Right now: 2 of 4 free, checked 3 minutes ago.

Reliability
50 / 100

Unreliable: scored 50 out of 100, which reads as roughly the chance it is working when you arrive.

Right now
2 of 4 free

Checked 3 minutes ago.

Price
50.4p per kWh

As published by the operator.

Connectors

ConnectorPowerStatus
Type 222 kWAvailable
Type 222 kWOut of service
Type 27 kWOut of service
Type 27 kWAvailable

When it’s busy

How busy the site usually is, by day and hour (UK time). Darker means more of the working connectors are in use.

0003060912151821
Mon
Tue
Wed
Thu
Fri
Sat
Sun

Striped cells are hours without enough history to say.

QuietBusy
Usually quietest

Monday 07:00 (0% in use), Monday 08:00 (0% in use), Monday 09:00 (0% in use)

Usually busiest

Friday 19:00 (50% in use), Friday 20:00 (50% in use), Friday 21:00 (50% in use)

Track record

Last 30 days
50% working

Share of the time its connectors were available or charging a car, across 31 days of readings.

Days with a fault
31 of 30

Days when at least one connector was reported out of service, however briefly.

Driver reports, 90 days
0

No trevl driver has reported on this site recently.

Questions about Pod Point Neuadd Bridge Caravan Park

Is Pod Point Neuadd Bridge Caravan Park reliable?

Unreliable: scored 50 out of 100, which reads as roughly the chance it is working when you arrive. Over the last 30 days its connectors were working 50% of the time we checked. At least one connector was reported out of service on 31 of the last 30 days.

When is Pod Point Neuadd Bridge Caravan Park busiest?

It is usually busiest on Friday 19:00 (50% in use), Friday 20:00 (50% in use), Friday 21:00 (50% in use). The quietest daytime slots are Monday 07:00 (0% in use), Monday 08:00 (0% in use), Monday 09:00 (0% in use). Times are UK time and come from weeks of live status readings.

How much does it cost to charge at Pod Point Neuadd Bridge Caravan Park?

The operator publishes a price of 50.4p per kWh. Prices change, so check the operator's app or the charger itself before you plug in.

What connectors does Pod Point Neuadd Bridge Caravan Park have?

Pod Point Neuadd Bridge Caravan Park, Powys has 2 × Type 2 at 22 kW, 2 × Type 2 at 7 kW.

Is Pod Point Neuadd Bridge Caravan Park working right now?

2 of 4 free. Checked 3 minutes ago. The operator publishes live status, and trevl reads it every few minutes.

Other chargers nearby

Plan a route that only stops where the chargers work

trevl watches sites like this one around the clock and plans your charging stops around the ones that will be working when you arrive, whatever you drive.