Pod Point Notre Dame Catholic Sixth Form College, Leeds
St Mark's Ave, Leeds, LS2 9BL
As of 24 October 2026, Pod Point Notre Dame Catholic Sixth Form College, Leeds has 4 connectors up to 7 kW, run by Pod Point. Its trevl reliability score is 100/100. Over the last 30 days its connectors were working 100% of the time, with at least one connector out of service on 2 days. It is usually busiest on Saturdays at 14:00 and quietest on Mondays at 07:00 (UK time). Right now: 4 of 4 free, checked 3 minutes ago.
Very reliable: scored 100 out of 100, which reads as roughly the chance it is working when you arrive.
Checked 3 minutes ago.
As published by the operator.
Connectors
| Connector | Power | Status |
|---|---|---|
| Type 2 | 7 kW | Available |
| Type 2 | 7 kW | Available |
| Type 2 | 7 kW | Available |
| Type 2 | 7 kW | Available |
When it’s busy
How busy the site usually is, by day and hour (UK time). Darker means more of the working connectors are in use.
| 00 | 03 | 06 | 09 | 12 | 15 | 18 | 21 | |||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Mon | ||||||||||||||||||||||||
| Tue | ||||||||||||||||||||||||
| Wed | ||||||||||||||||||||||||
| Thu | ||||||||||||||||||||||||
| Fri | ||||||||||||||||||||||||
| Sat | ||||||||||||||||||||||||
| Sun |
Striped cells are hours without enough history to say.
Monday 07:00 (0% in use), Monday 08:00 (0% in use), Monday 09:00 (0% in use)
Saturday 14:00 (3% in use), Saturday 13:00 (3% in use), Monday 07:00 (0% in use)
Track record
Share of the time its connectors were available or charging a car, across 31 days of readings.
Days when at least one connector was reported out of service, however briefly.
No trevl driver has reported on this site recently.
Questions about Pod Point Notre Dame Catholic Sixth Form College
Is Pod Point Notre Dame Catholic Sixth Form College reliable?
Very reliable: scored 100 out of 100, which reads as roughly the chance it is working when you arrive. Over the last 30 days its connectors were working 100% of the time we checked. At least one connector was reported out of service on 2 of the last 30 days.
When is Pod Point Notre Dame Catholic Sixth Form College busiest?
It is usually busiest on Saturday 14:00 (3% in use), Saturday 13:00 (3% in use), Monday 07:00 (0% in use). The quietest daytime slots are Monday 07:00 (0% in use), Monday 08:00 (0% in use), Monday 09:00 (0% in use). Times are UK time and come from weeks of live status readings.
How much does it cost to charge at Pod Point Notre Dame Catholic Sixth Form College?
The operator publishes a price of 39.6p per kWh. Prices change, so check the operator's app or the charger itself before you plug in.
What connectors does Pod Point Notre Dame Catholic Sixth Form College have?
Pod Point Notre Dame Catholic Sixth Form College, Leeds has 4 × Type 2 at 7 kW.
Is Pod Point Notre Dame Catholic Sixth Form College working right now?
4 of 4 free. Checked 3 minutes ago. The operator publishes live status, and trevl reads it every few minutes.
Other chargers nearby
All rapid chargers in Leeds, ranked by reliability
- UoL University Road0.5 km away · 22.1 kW · Clenergy
- UoL Cavendish Road 20.5 km away · 22.1 kW · Clenergy
- UoL Cavendish Road 10.5 km away · 22.1 kW · Clenergy
- Refectory0.6 km away · 22.1 kW · Clenergy
- UOL MSCP 80.7 km away · 22.1 kW · Clenergy
- UOL MSCP 70.7 km away · 22.1 kW · Clenergy
- UoL MSCP 30.7 km away · 22.1 kW · Clenergy
- UoL MSCP 40.7 km away · 3.4 kW · Clenergy
Plan a route that only stops where the chargers work
trevl watches sites like this one around the clock and plans your charging stops around the ones that will be working when you arrive, whatever you drive.