Pod Point St. Catherine's Leisure Park, Perth
St. Catherine's Leisure Park, Perth, PH1 5XA
As of 25 October 2026, Pod Point St. Catherine's Leisure Park, Perth has 6 connectors up to 75 kW, run by Pod Point. Its trevl reliability score is 87/100. Over the last 30 days its connectors were working 87.6% of the time, with at least one connector out of service on 30 days. It is usually busiest on Wednesdays at 07:00 and quietest on Mondays at 07:00 (UK time). Right now: 6 of 6 free, checked 3 minutes ago.
Reliable: scored 87 out of 100, which reads as roughly the chance it is working when you arrive.
Checked 3 minutes ago.
As published by the operator.
Connectors
| Connector | Power | Status |
|---|---|---|
| CCS | 75 kW | Available |
| CCS | 75 kW | Available |
| CCS | 75 kW | Available |
| CHAdeMO | 75 kW | Available |
| CHAdeMO | 75 kW | Available |
| CHAdeMO | 75 kW | Available |
When it’s busy
How busy the site usually is, by day and hour (UK time). Darker means more of the working connectors are in use.
| 00 | 03 | 06 | 09 | 12 | 15 | 18 | 21 | |||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Mon | ||||||||||||||||||||||||
| Tue | ||||||||||||||||||||||||
| Wed | ||||||||||||||||||||||||
| Thu | ||||||||||||||||||||||||
| Fri | ||||||||||||||||||||||||
| Sat | ||||||||||||||||||||||||
| Sun |
Striped cells are hours without enough history to say.
Monday 07:00 (0% in use), Monday 08:00 (0% in use), Monday 09:00 (0% in use)
Wednesday 07:00 (30% in use), Monday 14:00 (30% in use), Monday 13:00 (29% in use)
Track record
Share of the time its connectors were available or charging a car, across 31 days of readings.
Days when at least one connector was reported out of service, however briefly.
No trevl driver has reported on this site recently.
Questions about Pod Point St. Catherine's Leisure Park
Is Pod Point St. Catherine's Leisure Park reliable?
Reliable: scored 87 out of 100, which reads as roughly the chance it is working when you arrive. Over the last 30 days its connectors were working 87.6% of the time we checked. At least one connector was reported out of service on 30 of the last 30 days.
When is Pod Point St. Catherine's Leisure Park busiest?
It is usually busiest on Wednesday 07:00 (30% in use), Monday 14:00 (30% in use), Monday 13:00 (29% in use). The quietest daytime slots are Monday 07:00 (0% in use), Monday 08:00 (0% in use), Monday 09:00 (0% in use). Times are UK time and come from weeks of live status readings.
How much does it cost to charge at Pod Point St. Catherine's Leisure Park?
The operator publishes a price of 75.6p per kWh. Prices change, so check the operator's app or the charger itself before you plug in.
What connectors does Pod Point St. Catherine's Leisure Park have?
Pod Point St. Catherine's Leisure Park, Perth has 3 × CCS at 75 kW, 3 × CHAdeMO at 75 kW.
Is Pod Point St. Catherine's Leisure Park working right now?
6 of 6 free. Checked 3 minutes ago. The operator publishes live status, and trevl reads it every few minutes.
Other chargers nearby
All rapid chargers in Perth, ranked by reliability
- Mill Street0.6 km away · 50 kW · Charge Place Scotland
- Canal Street Car Park Ground Floor, Perth0.8 km away · 7 kW · Charge Place Scotland
- Perth Railway Station, Perth0.9 km away · 22 kW · Charge Place Scotland
- Kestrel Way, Muirton1 km away · 22 kW · Charge Place Scotland
- South Inch Car Park, Shore Road, Perth1.2 km away · 22 kW · Charge Place Scotland
- Fairfield - Perth1.4 km away · 7 kW · Charge Place Scotland
- John Clark Skoda1.6 km away · 11.1 kW · bp pulse
- Colonsay Resource Centre1.7 km away · 50 kW · Charge Place Scotland
Plan a route that only stops where the chargers work
trevl watches sites like this one around the clock and plans your charging stops around the ones that will be working when you arrive, whatever you drive.