Pod Point Tesco Head Office - Heart Building (For staff and visitors use only), Hertfordshire
Shire Park, The Boulevard Welwyn Garden City, Hertfordshire, AL7 1GB
As of 23 October 2026, Pod Point Tesco Head Office - Heart Building (For staff and visitors use only), Hertfordshire has 36 connectors up to 7 kW, run by Pod Point. Its trevl reliability score is 81/100. Over the last 30 days its connectors were working 80.6% of the time, with at least one connector out of service on 31 days. It is usually busiest on Wednesdays at 12:00 and quietest on Fridays at 07:00 (UK time). Right now: 22 of 36 free, checked 2 minutes ago.
Reliable: scored 81 out of 100, which reads as roughly the chance it is working when you arrive.
Checked 2 minutes ago.
As published by the operator.
Connectors
| Connector | Power | Status |
|---|---|---|
| Type 2 | 7 kW | Out of service |
| Type 2 | 7 kW | Out of service |
| Type 2 | 7 kW | Available |
| Type 2 | 7 kW | Available |
| Type 2 | 7 kW | Available |
| Type 2 | 7 kW | Available |
| Type 2 | 7 kW | Available |
| Type 2 | 7 kW | Available |
| Type 2 | 7 kW | Available |
| Type 2 | 7 kW | In use |
| Type 2 | 7 kW | Available |
| Type 2 | 7 kW | Available |
| Type 2 | 7 kW | Out of service |
| Type 2 | 7 kW | Available |
| Type 2 | 7 kW | Available |
| Type 2 | 7 kW | Available |
| Type 2 | 7 kW | Out of service |
| Type 2 | 7 kW | Available |
| Type 2 | 7 kW | In use |
| Type 2 | 7 kW | Available |
| Type 2 | 7 kW | In use |
| Type 2 | 7 kW | Out of service |
| Type 2 | 7 kW | Available |
| Type 2 | 7 kW | Available |
| Type 2 | 7 kW | In use |
| Type 2 | 7 kW | Available |
| Type 2 | 7 kW | Available |
| Type 2 | 7 kW | Available |
| Type 2 | 7 kW | Out of service |
| Type 2 | 7 kW | Available |
| Type 2 | 7 kW | Out of service |
| Type 2 | 7 kW | Available |
| Type 2 | 7 kW | Out of service |
| Type 2 | 7 kW | Out of service |
| Type 2 | 7 kW | In use |
| Type 2 | 7 kW | Available |
When it’s busy
How busy the site usually is, by day and hour (UK time). Darker means more of the working connectors are in use.
| 00 | 03 | 06 | 09 | 12 | 15 | 18 | 21 | |||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Mon | ||||||||||||||||||||||||
| Tue | ||||||||||||||||||||||||
| Wed | ||||||||||||||||||||||||
| Thu | ||||||||||||||||||||||||
| Fri | ||||||||||||||||||||||||
| Sat | ||||||||||||||||||||||||
| Sun |
Striped cells are hours without enough history to say.
Friday 07:00 (6% in use), Friday 19:00 (7% in use), Friday 20:00 (7% in use)
Wednesday 12:00 (83% in use), Tuesday 10:00 (81% in use), Wednesday 11:00 (79% in use)
Track record
Share of the time its connectors were available or charging a car, across 31 days of readings.
Days when at least one connector was reported out of service, however briefly.
No trevl driver has reported on this site recently.
Questions about Pod Point Tesco Head Office - Heart Building (For staff and visitors use only)
Is Pod Point Tesco Head Office - Heart Building (For staff and visitors use only) reliable?
Reliable: scored 81 out of 100, which reads as roughly the chance it is working when you arrive. Over the last 30 days its connectors were working 80.6% of the time we checked. At least one connector was reported out of service on 31 of the last 30 days.
When is Pod Point Tesco Head Office - Heart Building (For staff and visitors use only) busiest?
It is usually busiest on Wednesday 12:00 (83% in use), Tuesday 10:00 (81% in use), Wednesday 11:00 (79% in use). The quietest daytime slots are Friday 07:00 (6% in use), Friday 19:00 (7% in use), Friday 20:00 (7% in use). Times are UK time and come from weeks of live status readings.
How much does it cost to charge at Pod Point Tesco Head Office - Heart Building (For staff and visitors use only)?
The operator publishes a price of 44.4p per kWh. Prices change, so check the operator's app or the charger itself before you plug in.
What connectors does Pod Point Tesco Head Office - Heart Building (For staff and visitors use only) have?
Pod Point Tesco Head Office - Heart Building (For staff and visitors use only), Hertfordshire has 36 × Type 2 at 7 kW.
Is Pod Point Tesco Head Office - Heart Building (For staff and visitors use only) working right now?
22 of 36 free. Checked 2 minutes ago. The operator publishes live status, and trevl reads it every few minutes.
Other chargers nearby
All rapid chargers in Hertfordshire, ranked by reliability
- Pod Point Tesco Head Office - Omega Building (For staff and visitors use only)0.2 km away · 7 kW · Pod Point
- Pod Point Tesco Head Office - Pear Building (For staff and visitors use only)0.2 km away · 22 kW · Pod Point
- Pod Point Tesco Head Office - Checkout Building (For staff and visitors use only)0.2 km away · 7 kW · Pod Point
- Pod Point Tesco Head Office - Highwoods Building (For staff and visitors use only)0.2 km away · 7 kW · Pod Point
- The Bakehouse, Welwyn Garden City0.7 km away · 300 kW · Osprey Charging
- Shell Recharge EV Waitrose - Welwyn Garden City0.8 km away · 120 kW · Shell Recharge
- MFG Welwyn Garden City1.6 km away · 300 kW · MFG EV Power
- Shell Recharge Shell Little Waitrose Welwyn Garden2 km away · 400 kW · Shell Recharge
Plan a route that only stops where the chargers work
trevl watches sites like this one around the clock and plans your charging stops around the ones that will be working when you arrive, whatever you drive.