Royal Oak Hotel, Betws-Y-Coed
Royal Oak Hotel, Holyhead Road, Betws-Y-Coed, LL24 0AY
As of 23 October 2026, Royal Oak Hotel, Betws-Y-Coed has 4 connectors up to 50 kW, run by bp pulse. Its trevl reliability score is 0/100. Over the last 30 days its connectors were working 0% of the time, with at least one connector out of service on 31 days. Right now: status unknown, checked on 14 October 2026.
Unreliable: scored 0 out of 100, which reads as roughly the chance it is working when you arrive.
Checked on 14 October 2026.
As published by the operator.
Connectors
| Connector | Power | Status |
|---|---|---|
| CCS | 50 kW | Unknown |
| CHAdeMO | 50 kW | Unknown |
| Type 2 | 7.4 kW | Unknown |
| Type 2 | 7.4 kW | Unknown |
When it’s busy
This operator reports whether connectors work but not whether they’re in use, so this shows the usual share out of service instead. Darker means more faults.
| 00 | 03 | 06 | 09 | 12 | 15 | 18 | 21 | |||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Mon | ||||||||||||||||||||||||
| Tue | ||||||||||||||||||||||||
| Wed | ||||||||||||||||||||||||
| Thu | ||||||||||||||||||||||||
| Fri | ||||||||||||||||||||||||
| Sat | ||||||||||||||||||||||||
| Sun |
Striped cells are hours without enough history to say.
Track record
Share of the time its connectors were available or charging a car, across 22 days of readings.
Days when at least one connector was reported out of service, however briefly.
No trevl driver has reported on this site recently.
Questions about Royal Oak Hotel
Is Royal Oak Hotel reliable?
Unreliable: scored 0 out of 100, which reads as roughly the chance it is working when you arrive. Over the last 30 days its connectors were working 0% of the time we checked. At least one connector was reported out of service on 31 of the last 30 days.
How much does it cost to charge at Royal Oak Hotel?
The operator publishes a price of 74.2p per kWh. Prices change, so check the operator's app or the charger itself before you plug in.
What connectors does Royal Oak Hotel have?
Royal Oak Hotel, Betws-Y-Coed has 1 × CCS at 50 kW, 1 × CHAdeMO at 50 kW, 2 × Type 2 at 7.4 kW.
Is Royal Oak Hotel working right now?
Status unknown. Checked on 14 October 2026. The operator publishes live status, and trevl reads it every few minutes.
Other chargers nearby
All rapid chargers in Betws-Y-Coed, ranked by reliability
- Waterloo Hotel and Lodge 0.6 km away · 7 kW · Zero Carbon World
- Pod Point The Waterloo Hotel0.7 km away · 7 kW · Pod Point
- Bryn Bella Guest House0.7 km away · 7 kW · Zero Carbon World
- EVC Craig-y-Dderwen Riverside Hotel1 km away · 22 kW · Roam Charging (UK)
- Moel Siabod Cafe7.2 km away · 7 kW · Zero Carbon World
Plan a route that only stops where the chargers work
trevl watches sites like this one around the clock and plans your charging stops around the ones that will be working when you arrive, whatever you drive.