Rapid EV chargers in Stromness Ferry Terminal

3 rapid charging sites in Stromness Ferry Terminal that publish live status, ranked by how likely they are to be working when you arrive.

At a glance

As of 23 October 2026, trevl monitors 3 rapid charging sites in Stromness Ferry Terminal with live status. The most reliable is Ferry Road Long Stay Car Park (2) (97/100). The most powerful is Ferry Road Long Stay Car Park (2), at up to 50 kW. The average reliability score across them is 94/100. They are run by 1 network.

Ranked by reliability

#ChargerNetworkUp toReliability
1Ferry Road Long Stay Car Park (2)Charge Place Scotland50 kW97/100
2Ferry Road Long Stay Car Park (3)Charge Place Scotland50 kW94/100
3Stromness Ferry Terminal Rapid (Triple Outlet)Charge Place Scotland50 kW91/100

Networks

Charge Place Scotland (3 sites)

Questions about charging in Stromness Ferry Terminal

What is the most reliable rapid charger in Stromness Ferry Terminal?

Ferry Road Long Stay Car Park (2) (Charge Place Scotland), with a trevl reliability score of 97/100 - roughly the chance it is working when you arrive. Next are Ferry Road Long Stay Car Park (3) (94/100) and Stromness Ferry Terminal Rapid (Triple Outlet) (91/100).

How many rapid EV chargers are there in Stromness Ferry Terminal?

trevl monitors 3 rapid charging sites (50 kW or more) in Stromness Ferry Terminal that publish live status and have at least a week of readings. Sites without live status, or that are slower than 50 kW, are not included.

Which networks run rapid chargers in Stromness Ferry Terminal?

Charge Place Scotland.

What is the fastest EV charger in Stromness Ferry Terminal?

Ferry Road Long Stay Car Park (2), at up to 50 kW. How fast your car actually charges depends on its own charging curve as well.

Nearby towns

Driving through Stromness Ferry Terminal?

trevl plans your charging stops around the sites that will be working when you arrive, whatever you drive.