TEST SITE IDIADA, Nuneaton
TEST SITE IDIADA 52.502263, -1.473745, Nuneaton, MK14 6GY
As of 23 October 2026, TEST SITE IDIADA, Nuneaton has 2 connectors up to 7.4 kW, run by bp pulse. Its trevl reliability score is 62/100. Over the last 30 days its connectors were working 63.6% of the time, with at least one connector out of service on 9 days. It is usually busiest on Mondays at 07:00 and quietest on Mondays at 07:00 (UK time). Right now: 2 of 2 free, checked on 20 October 2026.
Mixed: scored 62 out of 100, which reads as roughly the chance it is working when you arrive.
Checked on 20 October 2026.
As published by the operator.
Connectors
| Connector | Power | Status |
|---|---|---|
| Type 2 | 7.4 kW | Available |
| Type 2 | 7.4 kW | Available |
When it’s busy
How busy the site usually is, by day and hour (UK time). Darker means more of the working connectors are in use.
| 00 | 03 | 06 | 09 | 12 | 15 | 18 | 21 | |||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Mon | ||||||||||||||||||||||||
| Tue | ||||||||||||||||||||||||
| Wed | ||||||||||||||||||||||||
| Thu | ||||||||||||||||||||||||
| Fri | ||||||||||||||||||||||||
| Sat | ||||||||||||||||||||||||
| Sun |
Striped cells are hours without enough history to say.
Monday 07:00 (0% in use), Monday 08:00 (0% in use), Monday 09:00 (0% in use)
Monday 07:00 (0% in use), Monday 08:00 (0% in use), Monday 09:00 (0% in use)
Track record
Share of the time its connectors were available or charging a car, across 19 days of readings.
Days when at least one connector was reported out of service, however briefly.
No trevl driver has reported on this site recently.
Questions about TEST SITE IDIADA
Is TEST SITE IDIADA reliable?
Mixed: scored 62 out of 100, which reads as roughly the chance it is working when you arrive. Over the last 30 days its connectors were working 63.6% of the time we checked. At least one connector was reported out of service on 9 of the last 30 days.
When is TEST SITE IDIADA busiest?
It is usually busiest on Monday 07:00 (0% in use), Monday 08:00 (0% in use), Monday 09:00 (0% in use). The quietest daytime slots are Monday 07:00 (0% in use), Monday 08:00 (0% in use), Monday 09:00 (0% in use). Times are UK time and come from weeks of live status readings.
How much does it cost to charge at TEST SITE IDIADA?
The operator publishes a price of 54.2p per kWh. Prices change, so check the operator's app or the charger itself before you plug in.
What connectors does TEST SITE IDIADA have?
TEST SITE IDIADA, Nuneaton has 2 × Type 2 at 7.4 kW.
Is TEST SITE IDIADA working right now?
2 of 2 free. Checked on 20 October 2026. The operator publishes live status, and trevl reads it every few minutes.
Other chargers nearby
All rapid chargers in Nuneaton, ranked by reliability
- IDIADA (PRIVATE)0 km away · 50 kW · bp pulse
- IDIADA bp pulse (PRIVATE)0 km away · 350 kW · bp pulse
- Holiday Inn Nuneaton0.6 km away · 50 kW · bp pulse
- Griffin, Nuneaton0.9 km away · 50 kW · Osprey Charging
- Attleborough Arms, Nuneaton1.9 km away · 75 kW · Osprey Charging
- Pod Point Tesco Extra - Bedworth2.4 km away · 7 kW · Pod Point
- MFG Bedworth2.6 km away · 150 kW · MFG EV Power
- MFG Weddington3.4 km away · 300 kW · MFG EV Power
Plan a route that only stops where the chargers work
trevl watches sites like this one around the clock and plans your charging stops around the ones that will be working when you arrive, whatever you drive.