West Hertfordshire NHS Ground Floor - DC 2, Watford

Watson Court, Stadium Way, Watford, WD18 0FA

ClenergyUp to 50 kWLive status from the operator
At a glance

As of 23 October 2026, West Hertfordshire NHS Ground Floor - DC 2, Watford has 3 connectors up to 50 kW, run by Clenergy. Its trevl reliability score is 89/100. Over the last 30 days its connectors were working 93% of the time, with at least one connector out of service on 18 days. It is usually busiest on Fridays at 10:00 and quietest on Mondays at 07:00 (UK time). Right now: 3 of 3 free, checked 3 minutes ago.

Reliability
89 / 100

Reliable: scored 89 out of 100, which reads as roughly the chance it is working when you arrive.

Right now
3 of 3 free

Checked 3 minutes ago.

Price
62.5p per kWh

Plus 16p per session.

Connectors

ConnectorPowerStatus
CCS50 kWAvailable
CHAdeMO50 kWAvailable
Type 222.1 kWAvailable

When it’s busy

How busy the site usually is, by day and hour (UK time). Darker means more of the working connectors are in use.

0003060912151821
Mon
Tue
Wed
Thu
Fri
Sat
Sun

Striped cells are hours without enough history to say.

QuietBusy
Usually quietest

Monday 07:00 (0% in use), Monday 08:00 (0% in use), Monday 09:00 (0% in use)

Usually busiest

Friday 10:00 (13% in use), Monday 07:00 (0% in use), Monday 08:00 (0% in use)

Track record

Last 30 days
93% working

Share of the time its connectors were available or charging a car, across 31 days of readings.

Days with a fault
18 of 30

Days when at least one connector was reported out of service, however briefly.

Driver reports, 90 days
0

No trevl driver has reported on this site recently.

Questions about West Hertfordshire NHS Ground Floor - DC 2

Is West Hertfordshire NHS Ground Floor - DC 2 reliable?

Reliable: scored 89 out of 100, which reads as roughly the chance it is working when you arrive. Over the last 30 days its connectors were working 93% of the time we checked. At least one connector was reported out of service on 18 of the last 30 days.

When is West Hertfordshire NHS Ground Floor - DC 2 busiest?

It is usually busiest on Friday 10:00 (13% in use), Monday 07:00 (0% in use), Monday 08:00 (0% in use). The quietest daytime slots are Monday 07:00 (0% in use), Monday 08:00 (0% in use), Monday 09:00 (0% in use). Times are UK time and come from weeks of live status readings.

How much does it cost to charge at West Hertfordshire NHS Ground Floor - DC 2?

The operator publishes a price of 62.5p per kWh, plus 16p per session. Prices change, so check the operator's app or the charger itself before you plug in.

What connectors does West Hertfordshire NHS Ground Floor - DC 2 have?

West Hertfordshire NHS Ground Floor - DC 2, Watford has 1 × CCS at 50 kW, 1 × CHAdeMO at 50 kW, 1 × Type 2 at 22.1 kW.

Is West Hertfordshire NHS Ground Floor - DC 2 working right now?

3 of 3 free. Checked 3 minutes ago. The operator publishes live status, and trevl reads it every few minutes.

Other chargers nearby

All rapid chargers in Watford, ranked by reliability

Plan a route that only stops where the chargers work

trevl watches sites like this one around the clock and plans your charging stops around the ones that will be working when you arrive, whatever you drive.