Allander Leisure Centre, Glasgow
Milngavie Road, Glasgow, G61 3DF
As of 23 October 2026, Allander Leisure Centre, Glasgow has 10 connectors up to 50 kW, run by Charge Place Scotland. Its trevl reliability score is 98/100. Over the last 30 days its connectors were working 97.9% of the time, with at least one connector out of service on 31 days. It is usually busiest on Saturdays at 09:00 and quietest on Tuesdays at 09:00 (UK time). Right now: 10 of 10 free, checked just now.
Very reliable: scored 98 out of 100, which reads as roughly the chance it is working when you arrive.
Checked just now.
As published by the operator.
Connectors
| Connector | Power | Status |
|---|---|---|
| CCS | 50 kW | Available |
| CCS | 50 kW | Available |
| CHAdeMO | 50 kW | Available |
| CHAdeMO | 50 kW | Available |
| Type 2 | 22 kW | Available |
| Type 2 | 22 kW | Available |
| Type 2 | 22 kW | Available |
| Type 2 | 22 kW | Available |
| Type 2 | 22 kW | Available |
| Type 2 | 22 kW | Available |
When it’s busy
How busy the site usually is, by day and hour (UK time). Darker means more of the working connectors are in use.
| 00 | 03 | 06 | 09 | 12 | 15 | 18 | 21 | |||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Mon | ||||||||||||||||||||||||
| Tue | ||||||||||||||||||||||||
| Wed | ||||||||||||||||||||||||
| Thu | ||||||||||||||||||||||||
| Fri | ||||||||||||||||||||||||
| Sat | ||||||||||||||||||||||||
| Sun |
Striped cells are hours without enough history to say.
Tuesday 09:00 (0% in use), Tuesday 21:00 (0% in use), Saturday 07:00 (0% in use)
Saturday 09:00 (30% in use), Saturday 10:00 (29% in use), Saturday 08:00 (28% in use)
Track record
Share of the time its connectors were available or charging a car, across 31 days of readings.
Days when at least one connector was reported out of service, however briefly.
No trevl driver has reported on this site recently.
Questions about Allander Leisure Centre
Is Allander Leisure Centre reliable?
Very reliable: scored 98 out of 100, which reads as roughly the chance it is working when you arrive. Over the last 30 days its connectors were working 97.9% of the time we checked. At least one connector was reported out of service on 31 of the last 30 days.
When is Allander Leisure Centre busiest?
It is usually busiest on Saturday 09:00 (30% in use), Saturday 10:00 (29% in use), Saturday 08:00 (28% in use). The quietest daytime slots are Tuesday 09:00 (0% in use), Tuesday 21:00 (0% in use), Saturday 07:00 (0% in use). Times are UK time and come from weeks of live status readings.
How much does it cost to charge at Allander Leisure Centre?
The operator publishes a price of 40p per kWh. Prices change, so check the operator's app or the charger itself before you plug in.
What connectors does Allander Leisure Centre have?
Allander Leisure Centre, Glasgow has 2 × CCS at 50 kW, 2 × CHAdeMO at 50 kW, 6 × Type 2 at 22 kW.
Is Allander Leisure Centre working right now?
10 of 10 free. Checked just now. The operator publishes live status, and trevl reads it every few minutes.
Other chargers nearby
All rapid chargers in Glasgow, ranked by reliability
- Pod Point Tesco Superstore - Glasgow Milngavie0.8 km away · 7 kW · Pod Point
- Mugdock Road Car Park, Milngavie, Glasgow1.2 km away · 22 kW · Charge Place Scotland
- Roman Road Car Park, Bearsden1.8 km away · 22 kW · Charge Place Scotland
- Cloberfield Street, Glasgow2.1 km away · 22 kW · Charge Place Scotland
- Linkwood Crescent4.2 km away · 22 kW · Charge Place Scotland
- Netherton Community Centre4.2 km away · 7 kW · Charge Place Scotland
- Morrisons Glasgow Anniesland4.6 km away · 50 kW · MFG EV Power
- Glasgow BMX Centre, Archerhill Road, Glasgow4.8 km away · 22 kW · Charge Place Scotland
Plan a route that only stops where the chargers work
trevl watches sites like this one around the clock and plans your charging stops around the ones that will be working when you arrive, whatever you drive.