John Lewis - Midsummer Boulevard, Milton Keynes
Outside John Lewis, Midsummer Boulevard, Milton Keynes, MK9 3EP
As of 23 October 2026, John Lewis - Midsummer Boulevard, Milton Keynes has 6 connectors up to 50 kW, run by bp pulse. Its trevl reliability score is 0/100. Over the last 30 days its connectors were working 0% of the time, with at least one connector out of service on 31 days. It is usually busiest on Mondays at 17:00 and quietest on Mondays at 07:00 (UK time). Right now: out of service, checked 3 minutes ago.
Unreliable: scored 0 out of 100, which reads as roughly the chance it is working when you arrive.
Checked 3 minutes ago.
As published by the operator.
Connectors
| Connector | Power | Status |
|---|---|---|
| CCS | 50 kW | Out of service |
| CCS | 50 kW | Out of service |
| CCS | 50 kW | Out of service |
| CHAdeMO | 50 kW | Out of service |
| Type 2 | 7.4 kW | Out of service |
| Type 2 | 7.4 kW | Out of service |
When it’s busy
How busy the site usually is, by day and hour (UK time). Darker means more of the working connectors are in use.
| 00 | 03 | 06 | 09 | 12 | 15 | 18 | 21 | |||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Mon | ||||||||||||||||||||||||
| Tue | ||||||||||||||||||||||||
| Wed | ||||||||||||||||||||||||
| Thu | ||||||||||||||||||||||||
| Fri | ||||||||||||||||||||||||
| Sat | ||||||||||||||||||||||||
| Sun |
Striped cells are hours without enough history to say.
Monday 07:00 (0% in use), Monday 08:00 (0% in use), Monday 09:00 (0% in use)
Monday 17:00 (100% in use), Wednesday 14:00 (100% in use), Wednesday 15:00 (100% in use)
Track record
Share of the time its connectors were available or charging a car, across 31 days of readings.
Days when at least one connector was reported out of service, however briefly.
No trevl driver has reported on this site recently.
Questions about John Lewis - Midsummer Boulevard
Is John Lewis - Midsummer Boulevard reliable?
Unreliable: scored 0 out of 100, which reads as roughly the chance it is working when you arrive. Over the last 30 days its connectors were working 0% of the time we checked. At least one connector was reported out of service on 31 of the last 30 days.
When is John Lewis - Midsummer Boulevard busiest?
It is usually busiest on Monday 17:00 (100% in use), Wednesday 14:00 (100% in use), Wednesday 15:00 (100% in use). The quietest daytime slots are Monday 07:00 (0% in use), Monday 08:00 (0% in use), Monday 09:00 (0% in use). Times are UK time and come from weeks of live status readings.
How much does it cost to charge at John Lewis - Midsummer Boulevard?
The operator publishes a price of 74.2p per kWh. Prices change, so check the operator's app or the charger itself before you plug in.
What connectors does John Lewis - Midsummer Boulevard have?
John Lewis - Midsummer Boulevard, Milton Keynes has 3 × CCS at 50 kW, 1 × CHAdeMO at 50 kW, 2 × Type 2 at 7.4 kW.
Is John Lewis - Midsummer Boulevard working right now?
Out of service. Checked 3 minutes ago. The operator publishes live status, and trevl reads it every few minutes.
Other chargers nearby
All rapid chargers in Milton Keynes, ranked by reliability
- Outside Milton Keynes Post Office0.1 km away · 7.4 kW · bp pulse
- Secklow Gate (Theatre Side)0.2 km away · 7.4 kW · bp pulse
- Avebury Boulevard0.2 km away · 50 kW · bp pulse
- Former Iceland Building0.2 km away · 7.4 kW · bp pulse
- Secklow Gate (Market Entrance)0.3 km away · 50 kW · bp pulse
- Centre:MK - Silbury Boulevard0.4 km away · 50 kW · bp pulse
- Outside Lloyds Bank0.4 km away · 7.4 kW · bp pulse
- MFG Childs Way0.5 km away · 150 kW · MFG EV Power
Plan a route that only stops where the chargers work
trevl watches sites like this one around the clock and plans your charging stops around the ones that will be working when you arrive, whatever you drive.