Secklow Gate (Theatre Side), Milton Keynes
Secklow Gate, Midsummer Boulev, Milton Keynes, MK9 3NE
As of 23 October 2026, Secklow Gate (Theatre Side), Milton Keynes has 4 connectors up to 7.4 kW, run by bp pulse. Its trevl reliability score is 98/100. Over the last 30 days its connectors were working 98.2% of the time, with at least one connector out of service on 4 days. It is usually busiest on Saturdays at 12:00 and quietest on Mondays at 07:00 (UK time). Right now: 3 of 4 free, checked 2 minutes ago.
Very reliable: scored 98 out of 100, which reads as roughly the chance it is working when you arrive.
Checked 2 minutes ago.
As published by the operator.
Connectors
| Connector | Power | Status |
|---|---|---|
| Type 2 | 7.4 kW | Available |
| Type 2 | 7.4 kW | Available |
| Type 2 | 7.4 kW | Out of service |
| Type 2 | 7.4 kW | Available |
When it’s busy
How busy the site usually is, by day and hour (UK time). Darker means more of the working connectors are in use.
| 00 | 03 | 06 | 09 | 12 | 15 | 18 | 21 | |||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Mon | ||||||||||||||||||||||||
| Tue | ||||||||||||||||||||||||
| Wed | ||||||||||||||||||||||||
| Thu | ||||||||||||||||||||||||
| Fri | ||||||||||||||||||||||||
| Sat | ||||||||||||||||||||||||
| Sun |
Striped cells are hours without enough history to say.
Monday 07:00 (0% in use), Monday 08:00 (0% in use), Monday 09:00 (0% in use)
Saturday 12:00 (25% in use), Saturday 19:00 (24% in use), Saturday 09:00 (21% in use)
Track record
Share of the time its connectors were available or charging a car, across 31 days of readings.
Days when at least one connector was reported out of service, however briefly.
No trevl driver has reported on this site recently.
Questions about Secklow Gate (Theatre Side)
Is Secklow Gate (Theatre Side) reliable?
Very reliable: scored 98 out of 100, which reads as roughly the chance it is working when you arrive. Over the last 30 days its connectors were working 98.2% of the time we checked. At least one connector was reported out of service on 4 of the last 30 days.
When is Secklow Gate (Theatre Side) busiest?
It is usually busiest on Saturday 12:00 (25% in use), Saturday 19:00 (24% in use), Saturday 09:00 (21% in use). The quietest daytime slots are Monday 07:00 (0% in use), Monday 08:00 (0% in use), Monday 09:00 (0% in use). Times are UK time and come from weeks of live status readings.
How much does it cost to charge at Secklow Gate (Theatre Side)?
The operator publishes a price of 54.2p per kWh. Prices change, so check the operator's app or the charger itself before you plug in.
What connectors does Secklow Gate (Theatre Side) have?
Secklow Gate (Theatre Side), Milton Keynes has 4 × Type 2 at 7.4 kW.
Is Secklow Gate (Theatre Side) working right now?
3 of 4 free. Checked 2 minutes ago. The operator publishes live status, and trevl reads it every few minutes.
Other chargers nearby
All rapid chargers in Milton Keynes, ranked by reliability
- Secklow Gate (Market Entrance)0.1 km away · 50 kW · bp pulse
- Outside Milton Keynes Post Office0.1 km away · 7.4 kW · bp pulse
- Former Iceland Building0.2 km away · 7.4 kW · bp pulse
- John Lewis - Midsummer Boulevard0.2 km away · 50 kW · bp pulse
- Avebury Boulevard0.2 km away · 50 kW · bp pulse
- Centre:MK - Silbury Boulevard0.3 km away · 50 kW · bp pulse
- Outside Lloyds Bank0.3 km away · 7.4 kW · bp pulse
- Front of PIP Consultation Centre0.4 km away · 7.4 kW · bp pulse
Plan a route that only stops where the chargers work
trevl watches sites like this one around the clock and plans your charging stops around the ones that will be working when you arrive, whatever you drive.