Pod Point Trinity Academy Leeds
Torre Road, Leeds, LS9 7QL
As of 23 October 2026, Pod Point Trinity Academy Leeds has 10 connectors up to 22 kW, run by Pod Point. Its trevl reliability score is 100/100. Over the last 30 days its connectors were working 100% of the time, with no faults reported. It is usually busiest on Fridays at 09:00 and quietest on Mondays at 16:00 (UK time). Right now: 10 of 10 free, checked 2 minutes ago.
Very reliable: scored 100 out of 100, which reads as roughly the chance it is working when you arrive.
Checked 2 minutes ago.
As published by the operator.
Connectors
| Connector | Power | Status |
|---|---|---|
| Type 2 | 22 kW | Available |
| Type 2 | 7 kW | Available |
| Type 2 | 7 kW | Available |
| Type 2 | 7 kW | Available |
| Type 2 | 7 kW | Available |
| Type 2 | 7 kW | Available |
| Type 2 | 7 kW | Available |
| Type 2 | 7 kW | Available |
| Type 2 | 7 kW | Available |
| Type 2 | 7 kW | Available |
When it’s busy
How busy the site usually is, by day and hour (UK time). Darker means more of the working connectors are in use.
| 00 | 03 | 06 | 09 | 12 | 15 | 18 | 21 | |||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Mon | ||||||||||||||||||||||||
| Tue | ||||||||||||||||||||||||
| Wed | ||||||||||||||||||||||||
| Thu | ||||||||||||||||||||||||
| Fri | ||||||||||||||||||||||||
| Sat | ||||||||||||||||||||||||
| Sun |
Striped cells are hours without enough history to say.
Monday 16:00 (0% in use), Monday 17:00 (0% in use), Monday 21:00 (0% in use)
Friday 09:00 (20% in use), Friday 10:00 (20% in use), Friday 11:00 (20% in use)
Track record
Share of the time its connectors were available or charging a car, across 31 days of readings.
Days when at least one connector was reported out of service, however briefly.
No trevl driver has reported on this site recently.
Questions about Pod Point Trinity Academy Leeds
Is Pod Point Trinity Academy Leeds reliable?
Very reliable: scored 100 out of 100, which reads as roughly the chance it is working when you arrive. Over the last 30 days its connectors were working 100% of the time we checked. No connector was reported out of service in the last 30 days.
When is Pod Point Trinity Academy Leeds busiest?
It is usually busiest on Friday 09:00 (20% in use), Friday 10:00 (20% in use), Friday 11:00 (20% in use). The quietest daytime slots are Monday 16:00 (0% in use), Monday 17:00 (0% in use), Monday 21:00 (0% in use). Times are UK time and come from weeks of live status readings.
How much does it cost to charge at Pod Point Trinity Academy Leeds?
The operator publishes a price of 39.6p per kWh. Prices change, so check the operator's app or the charger itself before you plug in.
What connectors does Pod Point Trinity Academy Leeds have?
Pod Point Trinity Academy Leeds has 1 × Type 2 at 22 kW, 9 × Type 2 at 7 kW.
Is Pod Point Trinity Academy Leeds working right now?
10 of 10 free. Checked 2 minutes ago. The operator publishes live status, and trevl reads it every few minutes.
Other chargers nearby
All rapid chargers in Leeds, ranked by reliability
- Morrisons Leeds Harehills1.4 km away · 50 kW · MFG EV Power
- Maude Street Car Park1.7 km away · 50 kW · GeniePoint
- Pod Point Trinity Leeds Car Park2.1 km away · 7 kW · Pod Point
- Pod Point Platform Building2.3 km away · 7 kW · Pod Point
- Pod Point UK12.4 km away · 7 kW · Pod Point
- UoL MSCP 9 (Blue Badge holders only)2.6 km away · 22.1 kW · Clenergy
- UoL MSCP 62.6 km away · 22.1 kW · Clenergy
- UoL MSCP 32.6 km away · 22.1 kW · Clenergy
Plan a route that only stops where the chargers work
trevl watches sites like this one around the clock and plans your charging stops around the ones that will be working when you arrive, whatever you drive.