Pod Point Trinity Leeds Car Park
Swinegate, Leeds, LS1 4AG
As of 24 October 2026, Pod Point Trinity Leeds Car Park has 13 connectors up to 7 kW, run by Pod Point. Its trevl reliability score is 92/100. Over the last 30 days its connectors were working 92.3% of the time, with at least one connector out of service on 31 days. It is usually busiest on Thursdays at 11:00 and quietest on Sundays at 20:00 (UK time). Right now: 9 of 13 free, checked just now.
Very reliable: scored 92 out of 100, which reads as roughly the chance it is working when you arrive.
Checked just now.
As published by the operator.
Connectors
| Connector | Power | Status |
|---|---|---|
| Type 2 | 7 kW | Available |
| Type 2 | 7 kW | Available |
| Type 2 | 7 kW | In use |
| Type 2 | 7 kW | Available |
| Type 2 | 7 kW | Available |
| Type 2 | 7 kW | Available |
| Type 2 | 7 kW | In use |
| Type 2 | 7 kW | In use |
| Type 2 | 7 kW | Out of service |
| Type 2 | 7 kW | Available |
| Type 2 | 7 kW | Available |
| Type 2 | 7 kW | Available |
| Type 2 | 7 kW | Available |
When it’s busy
How busy the site usually is, by day and hour (UK time). Darker means more of the working connectors are in use.
| 00 | 03 | 06 | 09 | 12 | 15 | 18 | 21 | |||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Mon | ||||||||||||||||||||||||
| Tue | ||||||||||||||||||||||||
| Wed | ||||||||||||||||||||||||
| Thu | ||||||||||||||||||||||||
| Fri | ||||||||||||||||||||||||
| Sat | ||||||||||||||||||||||||
| Sun |
Striped cells are hours without enough history to say.
Sunday 20:00 (8% in use), Sunday 21:00 (14% in use), Monday 07:00 (14% in use)
Thursday 11:00 (67% in use), Thursday 12:00 (67% in use), Wednesday 13:00 (66% in use)
Track record
Share of the time its connectors were available or charging a car, across 31 days of readings.
Days when at least one connector was reported out of service, however briefly.
No trevl driver has reported on this site recently.
Questions about Pod Point Trinity Leeds Car Park
Is Pod Point Trinity Leeds Car Park reliable?
Very reliable: scored 92 out of 100, which reads as roughly the chance it is working when you arrive. Over the last 30 days its connectors were working 92.3% of the time we checked. At least one connector was reported out of service on 31 of the last 30 days.
When is Pod Point Trinity Leeds Car Park busiest?
It is usually busiest on Thursday 11:00 (67% in use), Thursday 12:00 (67% in use), Wednesday 13:00 (66% in use). The quietest daytime slots are Sunday 20:00 (8% in use), Sunday 21:00 (14% in use), Monday 07:00 (14% in use). Times are UK time and come from weeks of live status readings.
How much does it cost to charge at Pod Point Trinity Leeds Car Park?
The operator publishes a price of 49.2p per kWh. Prices change, so check the operator's app or the charger itself before you plug in.
What connectors does Pod Point Trinity Leeds Car Park have?
Pod Point Trinity Leeds Car Park has 13 × Type 2 at 7 kW.
Is Pod Point Trinity Leeds Car Park working right now?
9 of 13 free. Checked just now. The operator publishes live status, and trevl reads it every few minutes.
Other chargers nearby
All rapid chargers in Leeds, ranked by reliability
- Pod Point Platform Building0.2 km away · 7 kW · Pod Point
- Maude Street Car Park0.4 km away · 50 kW · GeniePoint
- Pod Point PWC Central Square Leeds0.5 km away · 7 kW · Pod Point
- Pod Point Crisp central square0.5 km away · 7 kW · Pod Point
- Crowne Plaza Leeds0.9 km away · 7.4 kW · bp pulse
- Bowling Green Terrace1.1 km away · 22 kW · GeniePoint
- The Edge 11.1 km away · 22.1 kW · Clenergy
- The Edge 31.1 km away · 22.1 kW · Clenergy
Plan a route that only stops where the chargers work
trevl watches sites like this one around the clock and plans your charging stops around the ones that will be working when you arrive, whatever you drive.