Premier Inn Willen Lake, Milton Keynes
Willen Lake, Milton Keynes, MK15 0DS
As of 24 October 2026, Premier Inn Willen Lake, Milton Keynes has 6 connectors up to 50 kW, run by GeniePoint. Its trevl reliability score is 96/100. Over the last 30 days its connectors were working 96.5% of the time, with at least one connector out of service on 30 days. It is usually busiest on Tuesdays at 18:00 and quietest on Mondays at 07:00 (UK time). Right now: 5 of 6 free, checked just now.
Very reliable: scored 96 out of 100, which reads as roughly the chance it is working when you arrive.
Checked just now.
As published by the operator.
Connectors
| Connector | Power | Status |
|---|---|---|
| CCS | 50 kW | Available |
| CCS | 50 kW | In use |
| CHAdeMO | 50 kW | Available |
| CHAdeMO | 50 kW | Available |
| Type 2 | 22 kW | Available |
| Type 2 | 22 kW | Available |
When it’s busy
How busy the site usually is, by day and hour (UK time). Darker means more of the working connectors are in use.
| 00 | 03 | 06 | 09 | 12 | 15 | 18 | 21 | |||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Mon | ||||||||||||||||||||||||
| Tue | ||||||||||||||||||||||||
| Wed | ||||||||||||||||||||||||
| Thu | ||||||||||||||||||||||||
| Fri | ||||||||||||||||||||||||
| Sat | ||||||||||||||||||||||||
| Sun |
Striped cells are hours without enough history to say.
Monday 07:00 (0% in use), Monday 08:00 (0% in use), Monday 09:00 (0% in use)
Tuesday 18:00 (17% in use), Tuesday 19:00 (17% in use), Tuesday 20:00 (17% in use)
Track record
Share of the time its connectors were available or charging a car, across 31 days of readings.
Days when at least one connector was reported out of service, however briefly.
No trevl driver has reported on this site recently.
Questions about Premier Inn Willen Lake
Is Premier Inn Willen Lake reliable?
Very reliable: scored 96 out of 100, which reads as roughly the chance it is working when you arrive. Over the last 30 days its connectors were working 96.5% of the time we checked. At least one connector was reported out of service on 30 of the last 30 days.
When is Premier Inn Willen Lake busiest?
It is usually busiest on Tuesday 18:00 (17% in use), Tuesday 19:00 (17% in use), Tuesday 20:00 (17% in use). The quietest daytime slots are Monday 07:00 (0% in use), Monday 08:00 (0% in use), Monday 09:00 (0% in use). Times are UK time and come from weeks of live status readings.
How much does it cost to charge at Premier Inn Willen Lake?
The operator publishes a price of 82.8p per kWh. Prices change, so check the operator's app or the charger itself before you plug in.
What connectors does Premier Inn Willen Lake have?
Premier Inn Willen Lake, Milton Keynes has 2 × CCS at 50 kW, 2 × CHAdeMO at 50 kW, 2 × Type 2 at 22 kW.
Is Premier Inn Willen Lake working right now?
5 of 6 free. Checked just now. The operator publishes live status, and trevl reads it every few minutes.
Other chargers nearby
All rapid chargers in Milton Keynes, ranked by reliability
- Tree Cathedral Car Park0.2 km away · 50 kW · bp pulse
- Willen Lake North Car Park0.2 km away · 50 kW · bp pulse
- Willen Lake South Car Park0.4 km away · 50 kW · bp pulse
- Campbell Park Pavilion Car Park0.7 km away · 7.4 kW · bp pulse
- Pattison Lane1.3 km away · 50 kW · bp pulse
- Tower Crescent1.7 km away · 50 kW · bp pulse
- The Blacksmiths Arms, Milton Keynes1.8 km away · 60 kW · Osprey Charging
- John Lewis - Midsummer Boulevard1.9 km away · 50 kW · bp pulse
Plan a route that only stops where the chargers work
trevl watches sites like this one around the clock and plans your charging stops around the ones that will be working when you arrive, whatever you drive.